Results 11 to 15 of about 15 (15)
Determining the minimum required cooling time of profiled assemblies at the Armenian Nuclear Power Plant, taking into account the load schedule, is an analytical process to establish the shortest required period during which profiled assemblies used in ...
M. A. Hakobyan +3 more
doaj +1 more source
В статье рассказывается о том, как на кафедре «Организация строительства и управления недвижимостью» (ОСУН) МГСУ было положено начало еще одной, новой уникальной традиции — организации зарубежной производственной практики студентов.
Angela Bahauovna Mottaeva +4 more
doaj +1 more source
Some of the next articles are maybe not open access.
Related searches:
Related searches:
2017
ÐÑпÑÑÐºÐ½Ð°Ñ ÐºÐ²Ð°Ð»Ð¸ÑикаÑÐ¸Ð¾Ð½Ð½Ð°Ñ ÑабоÑа поÑвÑÑена ÑаÑÑмоÑÑÐµÐ½Ð¸Ñ ÑемÑ: анализ пÑиÑин пожаÑов на гидÑоÑлекÑÑоÑÑанÑиÑÑ Ð¸ пÑÑи повÑÑÐµÐ½Ð¸Ñ Ð¿Ð¾Ð¶Ð°Ñной безопаÑноÑÑи. ÐаÑеÑÐ¸Ð°Ð»Ñ Ð²Ñполненной ÑабоÑÑ Ð±Ð°Ð·Ð¸ÑÑÑÑÑÑ
openaire +1 more source
ÐÑпÑÑÐºÐ½Ð°Ñ ÐºÐ²Ð°Ð»Ð¸ÑикаÑÐ¸Ð¾Ð½Ð½Ð°Ñ ÑабоÑа поÑвÑÑена ÑаÑÑмоÑÑÐµÐ½Ð¸Ñ ÑемÑ: анализ пÑиÑин пожаÑов на гидÑоÑлекÑÑоÑÑанÑиÑÑ Ð¸ пÑÑи повÑÑÐµÐ½Ð¸Ñ Ð¿Ð¾Ð¶Ð°Ñной безопаÑноÑÑи. ÐаÑеÑÐ¸Ð°Ð»Ñ Ð²Ñполненной ÑабоÑÑ Ð±Ð°Ð·Ð¸ÑÑÑÑÑÑ
openaire +1 more source
2008
ÐоÑобие ÑооÑвеÑÑÑвÑÐµÑ Ð³Ð¾ÑÑдаÑÑÑÐ²ÐµÐ½Ð½Ð¾Ð¼Ñ Ð¾Ð±ÑазоваÑелÑÐ½Ð¾Ð¼Ñ ÑÑандаÑÑÑ Ð´Ð¸ÑÑиплин "ÐаÑовÑе ÑÑÑбинÑ", "ТепловÑе ÑлекÑÑиÑеÑкие ÑÑанÂÑии" и "Ð ÐµÐ¶Ð¸Ð¼Ñ ÑÐ°Ð±Ð¾Ñ Ð¢ÐС". ÐÑедназнаÑено Ð´Ð»Ñ Ð¿Ð¾Ð´Ð³Ð¾Ñовки бакалавÑов,
openaire +1 more source
ÐоÑобие ÑооÑвеÑÑÑвÑÐµÑ Ð³Ð¾ÑÑдаÑÑÑÐ²ÐµÐ½Ð½Ð¾Ð¼Ñ Ð¾Ð±ÑазоваÑелÑÐ½Ð¾Ð¼Ñ ÑÑандаÑÑÑ Ð´Ð¸ÑÑиплин "ÐаÑовÑе ÑÑÑбинÑ", "ТепловÑе ÑлекÑÑиÑеÑкие ÑÑанÂÑии" и "Ð ÐµÐ¶Ð¸Ð¼Ñ ÑÐ°Ð±Ð¾Ñ Ð¢ÐС". ÐÑедназнаÑено Ð´Ð»Ñ Ð¿Ð¾Ð´Ð³Ð¾Ñовки бакалавÑов,
openaire +1 more source
2019
In this paper, the main circuit of the electrical connection of the gas-oil KES with a capacity of 4x800 MW is designed. The method of selection the main equipment, the main circuit of electrical connections, the scheme of own needs, switching equipment, current-carrying parts are presented. The joint run-down of a turbogenerator with mechanisms of own
openaire +1 more source
In this paper, the main circuit of the electrical connection of the gas-oil KES with a capacity of 4x800 MW is designed. The method of selection the main equipment, the main circuit of electrical connections, the scheme of own needs, switching equipment, current-carrying parts are presented. The joint run-down of a turbogenerator with mechanisms of own
openaire +1 more source

