Results 111 to 120 of about 13,959 (141)
Some of the next articles are maybe not open access.
УÑÐµÑ Ð¸ анализ заÑÑÐ°Ñ Ð½Ð° пÑоизводÑÑво
2018ÐбÑекÑом иÑÑÐ»ÐµÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ ÑвлÑеÑÑÑ ÐÐР«ФилÑÑÑ-ÐлеменÑ». ÐÑÐµÐ´Ð¼ÐµÑ Ð¸ÑÑÐ»ÐµÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ â ÑÑÐµÑ Ð¸ анализ заÑÑÐ°Ñ Ð½Ð° пÑоизводÑÑво на пÑедпÑиÑÑии ÐÐР«ФилÑÑÑ-ÐлеменÑ». ЦелÑÑ Ð²ÑпÑÑкной квалиÑикаÑионной ÑабоÑÑ
openaire +1 more source
УпÑавление заÑÑаÑами на пÑедпÑиÑÑии
2018ÐбÑекÑом иÑÑÐ»ÐµÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ ÑвлÑеÑÑÑ ÐÐР«ÐÐ¾Ð»Ð¼Ð°Ñ ÐомплекÑ»». Ð¦ÐµÐ»Ñ ÑабоÑÑ â иÑÑледование напÑавлений ÑовеÑÑенÑÑÐ²Ð¾Ð²Ð°Ð½Ð¸Ñ Ð¼ÐµÑ Ð°Ð½Ð¸Ð·Ð¼Ð° ÑпÑÐ°Ð²Ð»ÐµÐ½Ð¸Ñ Ð·Ð°ÑÑаÑами на пÑедпÑиÑÑии.
openaire +1 more source
Физика гоÑÑÑей ÑеÑмоÑдеÑной Ð¿Ð»Ð°Ð·Ð¼Ñ Ñокамака
2020УÑебное поÑобие поÑвÑÑено Ð¸Ð·Ð»Ð¾Ð¶ÐµÐ½Ð¸Ñ ÐºÐ»ÑÑевÑÑ Ñизико-ÑÐµÑ Ð½Ð¸ÑеÑÐºÐ¸Ñ Ð¿Ñоблем ÑовÑеменнÑÑ ÑеÑмоÑдеÑнÑÑ ÑÑÑановок Ñипа Ñокамак, коÑоÑÑе видÑÑÑÑ Ð² наÑÑоÑÑее вÑÐµÐ¼Ñ Ð½Ð°Ð¸Ð±Ð¾Ð»ÐµÐµ пеÑÑпекÑивнÑми ÑÑÑÑойÑÑ ...
openaire +1 more source
2022
This thesis includes a calculation methodology for a waste heat boiler, as well as a steam recovery turbine, designed to work with a gas turbine plant as part of a gas compressor unit. The considered methods to design a waste heat boiler are oriented to the class of 32 MW gas turbine units.
openaire +1 more source
This thesis includes a calculation methodology for a waste heat boiler, as well as a steam recovery turbine, designed to work with a gas turbine plant as part of a gas compressor unit. The considered methods to design a waste heat boiler are oriented to the class of 32 MW gas turbine units.
openaire +1 more source
ÐоÑÑÐ¾Ð²Ð°Ñ Ð·Ð°ÑÑÐ´Ð½Ð°Ñ ÑÑанÑиÑ
ÐÑедмеÑом ÑазÑабоÑки ÑвлÑлаÑÑ ÑÐ¸Ð»Ð¾Ð²Ð°Ñ ÑаÑÑÑ Ð±Ð¾ÑÑового заÑÑдного ÑÑÑÑойÑÑва Ð´Ð»Ñ Ð»Ð¸Ñий-ионной баÑаÑеи. Ð¦ÐµÐ»Ñ ÑабоÑÑ â ÑвлÑеÑÑÑ Ð²ÑÐ±Ð¾Ñ ÑÑÑÑкÑÑÑÑ Ð¸ ÑазÑабоÑка Ñиловой ÑаÑÑи заÑÑдного ÑÑÑÑойÑÑва Ð ...openaire +1 more source
ÐазоÑÑÑÐ±Ð¸Ð½Ð½Ð°Ñ ÑÑÑановка моÑноÑÑÑÑ 16 ÐÐÑ
2022This work is devoted to the design of a stationary gas turbine with a power of 16 MW, based on the prototype V94, used to produce electricity in a simple and combined cycle. Tasks that were solved during the study: 1. Perform the calculation of the thermal circuit; 2. Make an approximate gas-dynamic calculation of the axial compressor and design of the
openaire +1 more source
Ðаземление ÑкÑанов одноÑазнÑÑ ÐºÐ°Ð±ÐµÐ»ÐµÐ¹ 6-500 кÐ
2013РаÑÑмоÑÑÐµÐ½Ñ Ð°ÐºÑÑалÑнÑе вопÑоÑÑ Ð¿ÑÐ¸Ð¼ÐµÐ½ÐµÐ½Ð¸Ñ ÑовÑеменнÑÑ Ð¾Ð´Ð½Ð¾ÑазнÑÑ ÑиловÑÑ ÐºÐ°Ð±ÐµÐ»ÐµÐ¹ 6-500 кРв ÑаÑÑи вÑбоÑа ÑÑ ÐµÐ¼Ñ ÑÐ¾ÐµÐ´Ð¸Ð½ÐµÐ½Ð¸Ñ Ð¸ Ð·Ð°Ð·ÐµÐ¼Ð»ÐµÐ½Ð¸Ñ ÑкÑанов, вÑбоÑа ÑеÑÐµÐ½Ð¸Ñ ÑкÑанов и заÑиÑÑ Ð¾Ð±Ð¾Ð»Ð¾Ñек Ð¾Ñ Ð¿ÐµÑ ...
openaire +1 more source
ÐазоÑÑÑÐ±Ð¸Ð½Ð½Ð°Ñ ÑÑÑановка моÑноÑÑÑ 15 ÐÐÑ
2020The aim of this work is the design and calculation of a gas turbine unit with a capacity of 15 MW, as well as its optimization. As a prototype, the PS-90GP-2 installation is used. In the course of the work, the calculation of the thermal circuit is carried out, based on the data obtained, the optimal degree of pressure increase in the compressor is ...
openaire +1 more source
ÐазоÑÑÑÐ±Ð¸Ð½Ð½Ð°Ñ ÑÑÑановка моÑноÑÑÑ 10,3 ÐÐÑ
2020The prototype for the GTU considered in this work is GTU-10P, made on the basis of the PS-90 aircraft engine. The aim of the work is the research, calculation and design of a gas turbine unit with a capacity of 10,3 MW. Tasks that were solved during the study: ï ¬Calculation of a thermal arrangement, which data is used in choice of the optimal ...
openaire +1 more source
ÐодеÑнизаÑÐ¸Ñ Ð²Ð¾Ð·Ð´ÑÑного вÑклÑÑаÑÐµÐ»Ñ 400 Ð,4000 Ð
2020Тема данной ÑабоÑÑ: модеÑнизаÑÐ¸Ñ Ð²Ð¾Ð·Ð´ÑÑного вÑклÑÑаÑÐµÐ»Ñ Ñ Ð½Ð¾Ð¼Ð¸Ð½Ð°Ð»ÑнÑми паÑамеÑÑами 400Ри 4000Ð. ÐÐ°Ð½Ð½Ð°Ñ ÑабоÑа поÑвÑÑена иÑÑÐ»ÐµÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ Ð¸ модеÑнизаÑии конÑакÑной ÑиÑÑÐµÐ¼Ñ Ð½Ð¸Ð·ÐºÐ¾Ð²Ð¾Ð»ÑÑного авÑомаÑÐ¸Ñ ...
openaire +1 more source

