Results 81 to 90 of about 117 (97)
Some of the next articles are maybe not open access.
ÐÐ°Ð½Ð½Ð°Ñ ÑабоÑа поÑвÑÑена изÑÑÐµÐ½Ð¸Ñ Ð»Ð¸ÑноÑÑной зÑелоÑÑи и ÑоÑиалÑно-пÑиÑ
ологиÑеÑкой адапÑаÑии ÑÑÑденÑов Ñ ÑелÑÑ Ð²ÑÑÐ²Ð»ÐµÐ½Ð¸Ñ Ð·Ð½Ð°ÑимÑÑ
ÑазлиÑий по ÑакÑоÑÑ Ð¿Ð¾Ð»Ð° и напÑÐ°Ð²Ð»ÐµÐ½Ð¸Ñ Ð¿Ð¾Ð´Ð³Ð¾Ñовки, а Ñакже иÑÑ
openaire +1 more source
openaire +1 more source
2020
The subject of the graduate qualification work is «Equipment selection and calculation of modes the local electric power system 330/110 kV». The work is specialized to the research of power system 330/110 kV, equipment selection and check of dynamic stability. Tasks which ware solved in the process of work: 1. Equipment selection for the power system
openaire +1 more source
The subject of the graduate qualification work is «Equipment selection and calculation of modes the local electric power system 330/110 kV». The work is specialized to the research of power system 330/110 kV, equipment selection and check of dynamic stability. Tasks which ware solved in the process of work: 1. Equipment selection for the power system
openaire +1 more source
2021
This paper describes the essence of the heat engineering calculation of the enclosing structures of a residential building. Materials for the exterior walls of the building are considered, compared and selected. The thermal engineering calculation of the enclosing structures was performed and the thermal characteristics of the building were calculated.
openaire +1 more source
This paper describes the essence of the heat engineering calculation of the enclosing structures of a residential building. Materials for the exterior walls of the building are considered, compared and selected. The thermal engineering calculation of the enclosing structures was performed and the thermal characteristics of the building were calculated.
openaire +1 more source
2022
Тема вÑпÑÑкной ÑабоÑÑ Ð±Ð°ÐºÐ°Ð»Ð°Ð²Ñа: «ÐбоÑнование ÑелеÑообÑазноÑÑи внедÑÐµÐ½Ð¸Ñ ÑиÑÑÐµÐ¼Ñ ÑпÑÐ°Ð²Ð»ÐµÐ½Ð¸Ñ ÑеÑÑÑÑами в компании авÑономнÑÑ ÑаниÑаÑнÑÑ ÑÑедÑÑв».ЦелÑÑ ÑабоÑÑ ÑвилоÑÑ Ð¾Ð±Ð¾Ñнование ÑелеÑообÑÐ ...
openaire +1 more source
Тема вÑпÑÑкной ÑабоÑÑ Ð±Ð°ÐºÐ°Ð»Ð°Ð²Ñа: «ÐбоÑнование ÑелеÑообÑазноÑÑи внедÑÐµÐ½Ð¸Ñ ÑиÑÑÐµÐ¼Ñ ÑпÑÐ°Ð²Ð»ÐµÐ½Ð¸Ñ ÑеÑÑÑÑами в компании авÑономнÑÑ ÑаниÑаÑнÑÑ ÑÑедÑÑв».ЦелÑÑ ÑабоÑÑ ÑвилоÑÑ Ð¾Ð±Ð¾Ñнование ÑелеÑообÑÐ ...
openaire +1 more source
2019
The use of atrium spaces in public buildings is becoming more frequent. Such popularity is due to such advantages as: ⢠Ergonomics and economy; ⢠Durability and endurance; ⢠Heat insulation and tightness; ⢠Fire safety The article is devoted to a comparative assessment of the use of various types of used structural elements: a system of metal ...
openaire +1 more source
The use of atrium spaces in public buildings is becoming more frequent. Such popularity is due to such advantages as: ⢠Ergonomics and economy; ⢠Durability and endurance; ⢠Heat insulation and tightness; ⢠Fire safety The article is devoted to a comparative assessment of the use of various types of used structural elements: a system of metal ...
openaire +1 more source
This work is devoted to the selection of main power equipment and secant wires of power transmission lines, calculation of steady state and short circuit, as well as the study of the transient stability of the 500/220 kV system. Tasks solved in the course of the work: 1. Selection of the main power equipment of the 500/220 kV electrical power system. 2.
openaire +1 more source
openaire +1 more source
2016
ÐÐ°Ð½Ð½Ð°Ñ Ð²ÑпÑÑÐºÐ½Ð°Ñ ÐºÐ²Ð°Ð»Ð¸ÑикаÑÐ¸Ð¾Ð½Ð½Ð°Ñ ÑабоÑа заÑÑÐ°Ð³Ð¸Ð²Ð°ÐµÑ Ð¾Ð´Ð½Ñ Ð¸Ð· акÑÑалÑнÑÑ Ñем Ð´Ð»Ñ ÐÐР«УРÐенинÑкаÑ»: РазÑабоÑка меÑопÑиÑÑий по повÑÑÐµÐ½Ð¸Ñ ÑÑÑекÑивноÑÑи иÑполÑÐ·Ð¾Ð²Ð°Ð½Ð¸Ñ Ð¾Ð±Ð¾ÑоÑнÑÑ ÑÑедÑÑв пÑÐµÐ´Ð¿Ñ ...
openaire +2 more sources
ÐÐ°Ð½Ð½Ð°Ñ Ð²ÑпÑÑÐºÐ½Ð°Ñ ÐºÐ²Ð°Ð»Ð¸ÑикаÑÐ¸Ð¾Ð½Ð½Ð°Ñ ÑабоÑа заÑÑÐ°Ð³Ð¸Ð²Ð°ÐµÑ Ð¾Ð´Ð½Ñ Ð¸Ð· акÑÑалÑнÑÑ Ñем Ð´Ð»Ñ ÐÐР«УРÐенинÑкаÑ»: РазÑабоÑка меÑопÑиÑÑий по повÑÑÐµÐ½Ð¸Ñ ÑÑÑекÑивноÑÑи иÑполÑÐ·Ð¾Ð²Ð°Ð½Ð¸Ñ Ð¾Ð±Ð¾ÑоÑнÑÑ ÑÑедÑÑв пÑÐµÐ´Ð¿Ñ ...
openaire +2 more sources
Topic of the final qualifying work: âSelection of equipment and calculation of electrical modes of the 220/110 kV electric power systemâ. The purpose of this final qualifying work: âselecting power system equipment, calculating maximum and minimum load modes, as well as emergency mode in the form of an asymmetrical short circuit, finding the ...
openaire +1 more source
openaire +1 more source
2019
Ð ÑабоÑе бÑла ÑаÑÑмоÑÑена ÑлекÑÑоÑнеÑгеÑиÑеÑÐºÐ°Ñ ÑиÑÑема 220/110 кÐ, вÑполнение коÑоÑой ÑоÑÑÐ¾Ð¸Ñ Ð¸Ð· ÑеÑÑÑÐµÑ ÑÑапов. Ðа пеÑвом ÑÑапе пÑоводиÑÑÑ Ð²ÑÐ±Ð¾Ñ Ð¾Ð±Ð¾ÑÑдованиÑ, ÑаÑÑмаÑÑиваемой ÑлекÑÑоÑнеÑгеÑиÑ
openaire +1 more source
Ð ÑабоÑе бÑла ÑаÑÑмоÑÑена ÑлекÑÑоÑнеÑгеÑиÑеÑÐºÐ°Ñ ÑиÑÑема 220/110 кÐ, вÑполнение коÑоÑой ÑоÑÑÐ¾Ð¸Ñ Ð¸Ð· ÑеÑÑÑÐµÑ ÑÑапов. Ðа пеÑвом ÑÑапе пÑоводиÑÑÑ Ð²ÑÐ±Ð¾Ñ Ð¾Ð±Ð¾ÑÑдованиÑ, ÑаÑÑмаÑÑиваемой ÑлекÑÑоÑнеÑгеÑиÑ
openaire +1 more source
The purpose of the study is to protect binary executable files in Windows OS based on the self-modified code. The subject of the research is modern methods of protecting against exploitation of binary files and executable files in Windows OS. Problems solved during the study: 1.
openaire +1 more source
openaire +1 more source