Results 71 to 76 of about 76 (76)
Some of the next articles are maybe not open access.
2020
The purpose of the final work is to design a variant of the power supply system for the new residential quarter No. 1 in the Pushkinsky district of St. Petersburg, which allows reliable and safe supply of electricity with an estimated capacity to six new multi-storey buildings.
openaire +1 more source
The purpose of the final work is to design a variant of the power supply system for the new residential quarter No. 1 in the Pushkinsky district of St. Petersburg, which allows reliable and safe supply of electricity with an estimated capacity to six new multi-storey buildings.
openaire +1 more source
This final qualifying work is devoted to improving the organization of traffic and improving safety in the Kalininsky district of St. Petersburg. The main problem of congestion in the Kalininsky district in St. Petersburg is caused by the discrepancy between the capacity of the transport system and the growing demand for personal transport.
openaire +1 more source
openaire +1 more source
2019
ÐÐ°Ð½Ð½Ð°Ñ ÑабоÑа ÑаÑÑмаÑÑÐ¸Ð²Ð°ÐµÑ Ð²Ð¾Ð¿ÑоÑÑ Ð¿ÑоекÑиÑÐ¾Ð²Ð°Ð½Ð¸Ñ ÑлекÑÑиÑеÑкой ÑаÑÑи водозабоÑного ÑооÑÑÐ¶ÐµÐ½Ð¸Ñ Ð³. ÐолоÑово, а Ñакже ÑаÑÑиÑнÑÑ ÑеконÑÑÑÑкÑÐ¸Ñ Ð¾ÑделÑнÑÑ ÐµÐµ ÑлеменÑов.
openaire +1 more source
ÐÐ°Ð½Ð½Ð°Ñ ÑабоÑа ÑаÑÑмаÑÑÐ¸Ð²Ð°ÐµÑ Ð²Ð¾Ð¿ÑоÑÑ Ð¿ÑоекÑиÑÐ¾Ð²Ð°Ð½Ð¸Ñ ÑлекÑÑиÑеÑкой ÑаÑÑи водозабоÑного ÑооÑÑÐ¶ÐµÐ½Ð¸Ñ Ð³. ÐолоÑово, а Ñакже ÑаÑÑиÑнÑÑ ÑеконÑÑÑÑкÑÐ¸Ñ Ð¾ÑделÑнÑÑ ÐµÐµ ÑлеменÑов.
openaire +1 more source
ÐеÑодиÑеÑкие ÑÐºÐ°Ð·Ð°Ð½Ð¸Ñ Ðº пÑÐ¾Ð²ÐµÐ´ÐµÐ½Ð¸Ñ Ð»Ð°Ð±Ð¾ÑаÑоÑнÑÑ
ÑÐ°Ð±Ð¾Ñ Ð¿Ð¾ кÑÑÑÑ Â«ÐÑÐ¸ÐºÐ»Ð°Ð´Ð½Ð°Ñ ÐеÑÑологиÑ» могÑÑ Ð±ÑÑÑ Ð¸ÑполÑÐ·Ð¾Ð²Ð°Ð½Ñ Ð´Ð»Ñ ÐºÑÑÑов «ÐеÑÑÐ¾Ð»Ð¾Ð³Ð¸Ñ Ð¸ измеÑиÑелÑÐ½Ð°Ñ ÑеÑ
ника» и «ÐеÑÑологиÑ, ÑÑандаÑÑизаÑиÑ
openaire +1 more source
openaire +1 more source
This graduate qualification work is devoted to the improvement of traffic organization and safety in Frunzensky district of St. Petersburg. The main problem of congestion on Slavy Avenue in St. Petersburg is caused by a mismatch between the capacity of the transportation system and the growing demand for personal transportation.
openaire +1 more source
openaire +1 more source
The aim of the study is the development of proposals to improve the system of execution of EPC-contracts at the enterprises of oil and gas complex. The study was carried out on the basis of PJSC âGazprom neftâ. Research subject: proposals to improve the system of execution of EPC-contracts at the enterprises of oil and gas complex. Research methods:
openaire +1 more source
openaire +1 more source

