Results 171 to 180 of about 218,760 (199)
Some of the next articles are maybe not open access.

Троицкий (Измайловский) собор. Реконструкция малого западного купола

2016
В проекте представлены краткие исторические сведения об объекте, результаты натурных обследований и выводы на их основе. Разработаны решения по реконструкции малого западного купола.
openaire   +1 more source

Реконструкция водоприемников Светогорской ГЭС-11 каскада Ð’ÑƒÐ¾ÐºÑÐ¸Ð½ÑÐºÐ¸Ñ Ð“Ð­Ð¡

2016
In this paper, we propose a new method for optimal reconstruction of emergency repair gates Svetogorskaya HPP-11 Cascade of Vuoksa HPP, with the help of the barrier as a floating gate repair.
openaire   +1 more source

Разработка конструктора Ð²Ð¸Ñ€Ñ‚ÑƒÐ°Ð»ÑŒÐ½Ñ‹Ñ Ð¿Ð¾Ð¼ÐµÑ‰ÐµÐ½Ð¸Ð¹

2023
This work is devoted to the development of an adaptive constructor for creating virtual three-dimensional rooms in Unity to simplify, speed up and systematize the production of various scenes within the framework of the tasks of creating virtual laboratories, art spaces and building levels, as well as other projects that involve the presence of rooms ...
openaire   +1 more source

Реконструкция подстанции «Южно-Ð¡Ð°Ñ Ð°Ð»Ð¸Ð½ÑÐºÐ°ÑÂ»

2021
Данная работа посвящена исследованию структурной схемы подстанции «Южно-Сахалинская» и модернизации имеющегося оборудования. Задачи, которые решались в ходе исследования: 1.
openaire   +1 more source

Система управления моментом вентильно-индукторного двигателя

2017
Объектом исследования является вентильно-индукторный двигатель (ВИД). Цель работы - выбор оптимального способа минимизации пульсаций момента ВИД и выработка рекомендаций по использованию сР...
openaire   +1 more source

Реконструкция подстанции Лодейнопольская 220-110-10 кВ

2018
Цель проекта – выбор нового современного оборудования взамен старого, пришедшего к моральному и физическому износу, проведение проверочного расчета по выбору оборудования.
openaire   +1 more source

Комплексная реконструкция подстанции 400 кВ Выборгская

2022
The theme of the final qualification work: "Comprehensive reconstruction of the 400 kV Vyborgskaya substation". The work is devoted to the reconstruction of the electrical part of the 400 kV Vyborgskaya substation with a subsequent change in the substation's circuit diagram.Tasks that were solved during the design: 1) analysis of the role of the 400 kV
openaire   +1 more source

Реконструкция ПС 35/10 кВ с заменой трансформаторов

2020
This paper presents the project of reconstruction of 35/10 kV substation № 714 "Detskoselskaya". Tasks that were solved during the design process: 1. Study of the location of the substation. 2. Review of existing power and switching equipment. 3. Study of the daily load schedules of the substation. 4. Selection of the 35 kV and 10 KV RC circuits.
openaire   +1 more source

Конструкция гидроэнергетического тракта Мельничной ГЭС

2021
The purpose of the work is to develop the construction of the hydropower path of the Melnichnaya Small Hydro Power Plant (SHPP). Installed capacity of SHPP N=420 kW. The hydroelectric power unit is located between Lake Verkhny and Lake Nizhny. Calculated head on the structure Z=10 m.
openaire   +1 more source

Реконструкция подстанции 10/0,4 кВ СПК «Рассвет»

2020
Topic of the final qualificationwork: "Reconstruction of TP10/0. 4 kV APC"Rassvet" This work is devoted to the study of the existing power supply of the APC, as well as measures for the reconstruction of the existing electrical installations. Tasks that were solved during the course of the work: 1.
openaire   +1 more source

Home - About - Disclaimer - Privacy