Results 131 to 137 of about 26,123 (137)
Some of the next articles are maybe not open access.
РаÑÑÑÑ ÑлекÑÑоÑнеÑгеÑиÑеÑкой ÑиÑÑÐµÐ¼Ñ 750/330 кÐ
2016Bachelor work includes the following executed sections: pre-selection and verification of cross-sections of wires of power lines and transformers parameters; calculation of the steady mode of operation of elements of power system by hand, and variational calculations with RastrWin software on a computer; the definition of currents and voltages during ...
openaire +1 more source
РаÑÑÑÑ ÑлекÑÑоÑнеÑгеÑиÑеÑкой ÑиÑÑÐµÐ¼Ñ 500/220 кÐ
2016РвÑпÑÑкной ÑабоÑе бакалавÑа бÑл пÑоизведен вÑÐ±Ð¾Ñ ÑиловÑÑ ÑÑанÑÑоÑмаÑоÑов и ÑеÑений пÑоводов линий ÑлекÑÑопеÑедаÑи. Также бÑл пÑоизведен ÑаÑÑÐµÑ ÑабоÑего Ñежима ÑлекÑÑиÑеÑкой ÑеÑи вÑÑÑнÑÑ Ð¸ Ñ
openaire +1 more source
2016
In this work we consider the regional 110/220 kV power system for which the equipment has been selected. Produced by manual calculation of steady operation, as well as payment via RastrWin software. Designed two-phase short-circuit current to earth for a given node. The calculation of dynamic stability, and measures were taken to increase it.
openaire +1 more source
In this work we consider the regional 110/220 kV power system for which the equipment has been selected. Produced by manual calculation of steady operation, as well as payment via RastrWin software. Designed two-phase short-circuit current to earth for a given node. The calculation of dynamic stability, and measures were taken to increase it.
openaire +1 more source
2019
The system of electricity supply 500/220 kV was studied. Elements of power supply system, such as power transformers, autotransformers and sections of power lines, were chosen. After this was done the calculation of the steady-state mode of operation manually and using software RastrWIN, as well as the modes of maximum and minimum loads and their ...
openaire +1 more source
The system of electricity supply 500/220 kV was studied. Elements of power supply system, such as power transformers, autotransformers and sections of power lines, were chosen. After this was done the calculation of the steady-state mode of operation manually and using software RastrWIN, as well as the modes of maximum and minimum loads and their ...
openaire +1 more source
2018
ÐÐ°Ð½Ð½Ð°Ñ ÑабоÑа поÑвÑÑена иÑÑÐ»ÐµÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ Ñежимов и динамиÑеÑкой ÑÑÑойÑивоÑÑи ÑлекÑÑоÑнеÑгеÑиÑеÑкой ÑиÑÑÐµÐ¼Ñ 500/330 кÐ. Ð Ñ Ð¾Ð´Ðµ ÑабоÑÑ Ð±Ñло вÑбÑано обоÑÑдование в ÑооÑвеÑÑÑвии Ñ Ð¸ÑÑ Ð¾Ð´Ð½Ñми даннÑми, Ð±Ñ ...
openaire +1 more source
ÐÐ°Ð½Ð½Ð°Ñ ÑабоÑа поÑвÑÑена иÑÑÐ»ÐµÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ Ñежимов и динамиÑеÑкой ÑÑÑойÑивоÑÑи ÑлекÑÑоÑнеÑгеÑиÑеÑкой ÑиÑÑÐµÐ¼Ñ 500/330 кÐ. Ð Ñ Ð¾Ð´Ðµ ÑабоÑÑ Ð±Ñло вÑбÑано обоÑÑдование в ÑооÑвеÑÑÑвии Ñ Ð¸ÑÑ Ð¾Ð´Ð½Ñми даннÑми, Ð±Ñ ...
openaire +1 more source
In the first part of the work was selected equipment of the power system: transformers, autotransformers, overhead lines and generators. In the second part of the work, the steady-state mode of the system was calculated manually and with the help of the software "RastrWin".
openaire +1 more source
openaire +1 more source
РвÑпÑÑкной квалиÑикаÑионной ÑабоÑе ÑаÑÑмаÑÑиваеÑÑÑ ÑлекÑÑоÑнеÑгеÑиÑеÑÐºÐ°Ñ ÑиÑÑема 500/220 кÐ. РабоÑа поÑвÑÑена Ð°Ð½Ð°Ð»Ð¸Ð·Ñ ÑÑой ÑиÑÑемÑ, как обÑекÑа генеÑаÑии и пеÑедаÑи ÑлекÑÑиÑеÑкой ÑнеÑгии.
openaire +1 more source
openaire +1 more source

