Results 11 to 20 of about 1,309 (155)

New Generation High-Performance VSC-HVDC Back-to-Back Technology and Application in Project [PDF]

open access: yes, 2023
[Introduction] Due to the dense load, complex grid structure, and close electrical connections in the Guangdong power grid area, there are three major problems for a long time: the risk of large-scale power outages, the interaction between AC and DC, and
Bo ZHU   +5 more
core   +1 more source

Research on the Interaction Between Multi-Circuit Shared HVDC Grounding Electrodes [PDF]

open access: yes, 2023
[Introduction] Unlike the independent grounding electrode, shared earth electrode is connected to multiple DC (Direct Current) systems, and its parameters and operation mode need to be determined by each system connected to it.
Wen WANG, Yu LIU
core   +1 more source

±1100 kV换流站直流场雷电侵入波过电压计算分析 [PDF]

open access: yes全球能源互联网, 2018
昌吉换流站和古泉换流站是±1100 kV昌吉—古泉特高压直流输电工程枢纽,一旦发生雷击损坏事故,可能造成大面积停电,影响十分严重。首先给出了换流站直流侧雷电侵入波过电压的计算方法,然后利用电磁暂态计算程序(EMTP),对±1100 kV昌吉换流站和古泉换流站直流侧设备的雷电侵入波过电压进行了仿真计算。给出了典型运行方式下,换流站进线段遭受反击和绕击时,换流站直流设备上的雷电侵入波过电压,确定了换流站直流侧避雷器的配置方案,并校核了换流站直流侧设备的雷电冲击绝缘水平。研究成果对保障±1100 kV昌吉 ...
陈秀娟   +6 more
doaj   +1 more source

直流故障引发直流外送系统新能源脱网问题研究 [PDF]

open access: yes, 2023
含高比例新能源的直流外送系统由于送端发电设备支撑能力薄弱,在直流故障发生后新能源发电设备面临着过电压脱网风险。为了防止新能源脱网事故的发生,首先建立新能源直流外送系统仿真模型分析新能源机端暂态过电压形成机理,其次根据无功传输规律分析常规机组、调相机、电气距离等因素对新能源脱网的影响,定量分析常规机组的电压调节灵敏度,在此基础上利用新能源短路比指标对新能源脱网情况进行量化分析,最后根据分析结果提出了提高短路容量、提高风机高压穿越能力等预防直流故障后新能源脱网的策略 ...
严欢   +5 more
core   +1 more source

张北工程风电柔直汇集系统次、超同步振荡分析 [PDF]

open access: yes, 2023
张北可再生能源柔性直流电网工程投运以来,交直流系统中数次出现次、超同步振荡问题。对2022年某日振荡发生时现场录波采集到的交直流振荡波形数据进行分析,录波数据分析表明,交流侧的次同步(43.75 Hz)、超同步(56.25 Hz)振荡,在dq坐标系下均表现为6.25 Hz振荡,同时在直流电压和直流电流中也出现了6.25 Hz的振荡频率。初步判断振荡发生的原因是:风电场功率快速变化时,站间骤然变化的直流电压引起了直流电流发生振荡,直流电流通过直流通路造成MMC子模块电容电压产生振荡 ...
刘一民   +5 more
core   +1 more source

Method and application of carbon emission calculation for ultra-high voltage (UHV) project construction [PDF]

open access: yes, 2023
[Objective] As one of the seven key areas of “new infrastructure” development during China’s 14th Five-Year Plan period, the ultra-high voltage (UHV) projects are the backbone of China’s new power system and is of great significance to the transmission ...
CHEN Xiaohong, FU Yipeng, HUANG Chengdong, WANG Yangjie
core   +1 more source

Research on Construction Mode of Large-Scale Offshore Wind Power Centralized Transmission [PDF]

open access: yes, 2023
[Introduction] Offshore wind power has become a research hotspot in the development of global wind power. China's offshore wind power is still in its infancy, the current operation mode is not conducive to the large-scale centralized transmission of ...
Ni LI   +3 more
core   +1 more source

Analysis of Current Situation and Future Development of Offshore Wind Power Industry [PDF]

open access: yes, 2023
[Introduction] Under the trend of accelerating the clean transformation of coastal energy and adjusting the industrial structure, offshore wind power will become an important support for the safe, clean and efficient transformation of power energy in ...
Jiachang LIU   +3 more
core   +1 more source

考虑光伏消纳的配电网储能与直流选址定容协同规划 [PDF]

open access: yes, 2023
大规模分布式光伏的接入将对配电网的安全经济运行带来重要影响,分布式光伏发电的时效性变化和光伏装机的区域性差异为有效进行新能源消纳带来挑战。为此,通过提出配电网储能与直流线路协同规划架构,针对光伏随时间波动的不平衡,使用储能装置进行电能存储,实现电力的削峰填谷。针对区域光伏分布不均,通过建设直流线路以实现区域间能量互济,消纳光伏溢出区域的发电量。进一步,以投资成本、维护成本和电能费用构成的年综合费用最小为目标,构建储能及直流线路选址定容的交直流配电网优化规划问题,实现区域内和区域间光伏溢出功率的高质量 ...
刘俊杉   +5 more
core   +1 more source

Research on Flexible HVDC Transmission Technology and Strategies for Improving the Operational Stability of IGBT Components [PDF]

open access: yes, 2023
[Introduction] With the continuous improvement of the strategic position of clean energy, more and more new energy power generation equipment is connected to the power grid, but its power quality is unstable, which has a great impact on the AC ...
Tao WANG   +3 more
core   +1 more source

Home - About - Disclaimer - Privacy