Results 11 to 20 of about 4,689 (149)

Redundant control method for yaw overload protection of wind turbine [PDF]

open access: yes, 2021
The article considers the possibility of using hydrophobic coatings on the internal surfaces of main transport equipment to reduce the wettability zone and hydraulic roughness.
Chertkov, V., Zheng Jiebin
core   +2 more sources

基于电力现货市场仿真的海上风电接入对广东省电力行业碳减排影响评估 [PDF]

open access: yes全球能源互联网, 2020
为应对全球气候变化,电力行业低碳化能源转型迫在眉睫。针对2019—2028年广东省的能源规划,搭建广东省电力系统简化模型,依据安全约束经济调度原理仿真电力现货市场,评估大规模海上风电的接入对广东省电力行业碳排放的影响。仿真结果表明,按广东省海上风电发展规划接入海上风电后:电力行业总碳排量和系统碳排放强度均有不同程度的降低;海上风电减排贡献百分比逐年提升,最高可达20%;A类机组碳排放量和碳排放强度基本不变;B类机组相关碳排放数据变化趋势与广东省基本一致;对于接入海上风电场的节点 ...
宋怡, 林晨韵, 梁高琪, 赵俊华
doaj   +1 more source

基于多储能系统的风电黑启动方案设计 [PDF]

open access: yes全球能源互联网, 2020
区域电网的黑启动能力是电力系统安全运行的重要保障之一。随着风电和光伏发电在系统中占比越来越高,特别对于风电装机占比高但水电少、甚至无水电的地区,风电结合储能能否作为黑启动电源受到研究者关注。结合黑启动方案规范,设计了基于多储能系统的风电场黑启动方案,提出风-储联合系统黑启动过程的4个主要阶段,并提出以持续有效出力概率计算风电汇集地区全年能满足黑启动的时段占比,衡量地区风电黑启动成功概率。最后基于PSCAD对简化的风-储联合系统仿真储能自启动、风电场启动及火电机组辅机启动3个过程,初步从暂态层面验证了风 ...
李翠萍   +6 more
doaj   +1 more source

Research for Inertia Response and Primary Frequency Regulation Ability of Wind Turbine [PDF]

open access: yes, 2023
[Introduction] Large-scale connection of wind power to the power grid poses great challenges to the stability (especially frequency stability) of grid operation.In order to solve the problem of inadequate frequency regulation capability caused by large ...
Jiangtao GUO   +4 more
core   +1 more source

International clinical practice recommendations on the definition, diagnosis, assessment, intervention, and psychosocial aspects of developmental coordination disorder – Chinese (Mandarin) translation

open access: yesDevelopmental Medicine &Child Neurology, Volume 61, Issue 3, Page E1-E35, March 2019., 2019
目的 本国际临床指南由欧洲残疾儿童学会(the European Academy of Childhood Disability,EACD)牵头制定,旨在解决发育性协调障碍(developmental coordination disorder,DCD)的定义、诊断、评估、干预以及与社会心理方面的临床应用关键问题。 方法 本指南针对五个领域的关键问题,通过文献综述和专家团队的正式讨论达成共识。为保证指南的循证基础,以“机制”、“评估”和“干预”为检索词, 对2012年更新以来提出的最新建议以及新增的“社会心理问题”和“青少年/成人”为检索词进行检索。根据牛津大学循证医学中心证据等级 (证据水平 [level of evidence, LOE]1–4) 将结果进行分类,最终转化为指南建议。并由国际 ...
Jing Hua   +6 more
wiley   +1 more source

Research on Design Optimization of Offshore Booster Stations [PDF]

open access: yes, 2023
[Introduction] In recent years, China has put into operation a large number of offshore booster stations and accumulated rich experience in the construction and operation of offshore booster stations.
Binrui ZHANG, Lei SU, Xiaogang WANG
core   +1 more source

Analysis of Current Situation and Future Development of Offshore Wind Power Industry [PDF]

open access: yes, 2023
[Introduction] Under the trend of accelerating the clean transformation of coastal energy and adjusting the industrial structure, offshore wind power will become an important support for the safe, clean and efficient transformation of power energy in ...
Jiachang LIU   +3 more
core   +1 more source

考虑雷电过电压的风电机组拓扑结构优化

open access: yesDianci bileiqi, 2021
风力发电机遭受雷击时,塔筒内控制电缆、塔基处以及箱式变压器低/高压侧都会出现过电压,且过电压还会通过集电电缆和联合接地装置传到其他风电机组。为研究雷击风电场时引起的暂态电压,建立了包含风力发电机、集电电缆、箱式变压器的等效模型。考虑了雷电流参数、风力发电机接地电阻大小及风电场拓扑结构对风电场过电压影响。结果表明:单台风电机组遭受雷击的情况下,风电机组过电压值与雷电流幅值成正比,且波前时间为8.0μs和20.0μs时,雷电流幅值对控制电缆缆芯过电压影响很小;风电机组过电压值与波前时间成反比 ...
罗永志   +5 more
doaj  

±500 kV柔直电网与新能源和常规发电机组的协调控制研究 [PDF]

open access: yes全球能源互联网, 2018
张北±500 kV四端柔直电网工程的送端张北站和康保站作为新能源外送的汇集站,分别连接大规模风电场群,受端北京站和丰宁站分别作为新能源消纳中心和柔直电网的功率平衡节点与华北地区交流电网相连接,丰宁站建有抽蓄机组为系统提供紧急功率支撑。整个工程结构复杂,风电场群出力间歇性、随机性大,柔直系统直流电压对多端有功功率的吞吐平衡量敏感性强,受端负荷中心对电能质量要求高,这为柔直换流器、新能源风电机组和抽蓄机组的控制提出了严峻挑战。针对三者的协调控制展开研究,为柔直送端换流器设计了带频率附加控制的V-f控制 ...
王炳辉   +6 more
doaj   +1 more source

基于分布鲁棒机会约束优化的电力系统不确定性出清机制 [PDF]

open access: yes全球能源互联网, 2023
风电机组的大规模并网使系统的发电容量备用需求激增,由此产生的额外备用成本也理应由风电机组承担。但目前的电力市场机制并没有体现上述原则,在备用成本分摊上存在明显的交叉补贴问题。针对上述问题,以不确定性方差表征功率预测不确定性,构建了基于分布鲁棒机会约束优化的日前经济调度和不确定性出清模型。进一步推导出由发电容量价格和输电容量价格两部分组成的不确定性边际价格,分别对应了对传统机组和对线路的机会成本损失补偿,并理论证明该出清机制收支平衡。通过PJM 5节点系统算例证明了该模型可以有效应对系统中的预测不确定性 ...
邓方钊   +5 more
doaj   +1 more source

Home - About - Disclaimer - Privacy