Results 51 to 60 of about 1,516 (110)

东山岛与澎湖列岛风电产业合作前景探讨 [PDF]

open access: yes, 2015
发展风电产业是当前世界各国和地区为实现经济发展低碳化而采取的新型产业发展方向之一。福建省东山岛与台湾的澎湖列岛同属常规能源较贫乏而风能资源较丰富的地区。在推进两岸新兴产业合作的进程中,两地可基于彼此的相对竞争优势而开展风电产业合作,进而提升两地在风电产业方面的整合竞争力。2013年度国家社科基金项目“丰富‘一国两制’实践和推进祖国统一研究”(批准号:13&ZD052)资助; 2013年度教育部人文社会科学重点研究基地重大项目“海峡两岸民间社会桥接模式和路径研究”(批准号:13JJD810011 ...
王勇
core  

Accessibility and boarding technology for offshore wind power platforms in China: current status and future prospects [PDF]

open access: yes
Objective Most offshore wind power platforms are unmanned, resulting in high operation and maintenance costs due to the complex operating environment, limited accessibility, and short time window for going offshore.
Chao LIU   +4 more
core   +1 more source

Overview of Current Situation and Trend of Offshore Wind Power Development in China [PDF]

open access: yes
Under the carbon peak goal and carbon neutral vision, offshore wind power has made great progress in China in recent years. The current development status and future planning of offshore wind power in China were analyzed, summarizing the installed ...
MA Kuichao   +5 more
core   +1 more source

Effects of shared lines with different materials on mooring response of the floating wind farm [PDF]

open access: yes
ObjectivesThis paper investigates the impact of shared lines with different materials on the dynamic response of floating wind farms in order to design a rational shared mooring system. MethodsFirst, shared mooring and traditional (without shared cables)
Fan ZHONG   +5 more
core   +1 more source

The Risk Contralling &Analysis of Investment Project About Beijing Guanting Wind Power [PDF]

open access: yes, 2008
2006年8月,北京京能能源科技投资有限公司(原北京市能源投资公司,以下简称能源公司)正式获得北京市发改委关于投资建设北京官厅风电场一期工程的核准,一期工程核准总投资为5.8亿元,装机容量49.5MW,2007年底具备发电条件,年发电量约1亿kWh。该工程的实施体现了北京市政府积极开发、利用清洁能源的战略决策,标志着北京市风力发电实现零的突破,是中国政府实现举办2008年“绿色奥运”承诺的具体体现。 对于风力发电项目而言,相对于火电、水电,其单位千瓦投资比较大,电价高,存在较大投资风险 ...
任启贵
core  

High Voltage Crossing Strategy of Wind Farm Considering Active and Reactive Coordinated Recovery [PDF]

open access: yes
ObjectivesTo address the serious high voltage ride-through (HVRT) problem faced by wind farms as a result of the large voltage surge at the grid-connected point after a DC fault, a recovery mechanism of “active priority balancing - reactive power dynamic
HAN Lu   +4 more
core   +1 more source

The Study on Economic Impact and Reliability of Wind Power Generation and Integration [PDF]

open access: yes, 2015
本文系统的研究了风电场的建设、风力发电、风电并网的经济性以及风电并网的可靠性,并以福建可门口风电场作为实证研究对象。 首先,通过WERA模型研究风电场的风能潜能,并以此为前提基础,通过进一步研究表明:中国南部沿海陆上风力发电的度电成本为0.497元/千瓦时,如果按当前风电并网价格计算,风电项目的内部收益率为18.7%,高于其他行业的平均报酬率;如果考虑风电并网的环境效益,风电并网的环境效益为0.172元/千瓦时,环境效益显著,其中风电建设和后期处置的环境成本忽略不计。 其次 ...
张孙金
core  

Short-Term Wind Power Prediction Method Considering Wind Turbine Operation Status Clustering Under Low-Temperature Conditions [PDF]

open access: yes
ObjectivesLow-temperature weather poses challenges to the operation of power systems with a high proportion of new energy, such as wind power. Improving the accuracy of short-term wind power prediction under low-temperature conditions will provide ...
FU Xuejiao   +5 more
core   +1 more source

Effect of Hydrogen Production System on Sub-Synchronous Oscillation Characteristics of Doubly Fed Induction Generator Systems With Series Compensation [PDF]

open access: yes
ObjectivesThe grid-connected operation of large-scale wind turbines increases the risks of sub-synchronous oscillation (SSO) in power systems, to address these issues, this study conducts an in-depth analysis of the effect of hydrogen production systems ...
LIU Zenan, LU Yanan, XU Tao
core   +1 more source

Application of Lead Differential Control in Coordinated Hydro and Wind Power Generation [PDF]

open access: yes, 2015
Chen, Qiyu   +4 more
core   +1 more source