Results 1 to 10 of about 1,591 (104)
规模化可再生能源的集中并网和特高压直流工程的投产将显著影响送端电网的安全稳定特性。在分析可再生能源、特高压直流工程与弱送端交流电网相互影响的基础上,提出了集可再生能源发电特性研究、特高压直流外送方案、特高压直流落点选择、交流电网构建方案、典型方式建立、安全稳定评估为一体的交直流混联电网实用规划方法,明确了特高压直流落点后电网规划中应关注的重点问题,保障了新能源机组、特高压直流工程及送端电网的安全可靠运行。最后以青豫直流工程为例验证了所提方法的有效性。
张鑫, 李媛媛, 吉平
doaj +1 more source
Method and application of carbon emission calculation for ultra-high voltage (UHV) project construction [PDF]
[Objective] As one of the seven key areas of “new infrastructure” development during China’s 14th Five-Year Plan period, the ultra-high voltage (UHV) projects are the backbone of China’s new power system and is of great significance to the transmission ...
CHEN Xiaohong, FU Yipeng, HUANG Chengdong, WANG Yangjie
core +1 more source
针对特高压直流闭锁等原因造成的受端电网频率严重跌落问题,提出一种储能紧急频率控制策略。首先,建立储能参与紧急频率控制的数学模型。其次,对于大功率缺额后发电机组惯性响应不足问题,提出了改进的频率变化率(rate of change of frequency,RoCoF)下垂控制策略以提高储能的惯量支撑,根据储能比例分配系数实时调节储能虚拟惯性及下垂控制出力;惯性响应阶段以RoCoF下垂控制为主、虚拟惯性控制为辅,抑制系统频率变化率;结合频率调节需求和储能系统出力特点提出不同区域的调频策略 ...
苏大威, 葛乐, 郝雨辰, 高水朋
core +1 more source
Research on Lightning Performance and Protective Measures of ±800 kV UHVDC Power Transmission Line [PDF]
[Introduction] Lightning strike is the primary cause of failures of ±800 kV UHVDC power transmission lines, and the lightning protection assessment of power transmission lines is critical to the safe and stable operation of the system.
Youjun GONG, Zhiwen HE, Ziwei YAN
core +1 more source
支撑新能源基地电力外送的电源组合优化配置策略研究 [PDF]
新能源基地化开发和电力外送是实现能源电力清洁低碳转型的重要途径。新能源发电间歇性和波动性以及有限的输电走廊资源要求基地配置调节电源以提高新能源电力外送工程的可靠性和源网利用率。提出了基于广域长期历史气象数据,采用时序生产模拟电源扩展优化模型,进行不同送电方案下调节电源与新能源装机优化组合策略的研究方法。以内蒙古沙漠地区新能源基地为例的研究表明,电化学储能为代表的无源型调节电源应配置为外送通道容量的35%左右,从而实现合理的通道利用率和基地发输电经济性;配置有源型调节电源,可实现更高的外送通道利用率 ...
刘泽洪, 周原冰, 金晨
core +1 more source
Research on the Interaction Between Multi-Circuit Shared HVDC Grounding Electrodes [PDF]
[Introduction] Unlike the independent grounding electrode, shared earth electrode is connected to multiple DC (Direct Current) systems, and its parameters and operation mode need to be determined by each system connected to it.
Wen WANG, Yu LIU
core +1 more source
500kV直流断路器快速机械开关典型故障特性及可靠性提升方法研究 [PDF]
直流断路器是构建柔性直流电网不可或缺的关键设备。快速机械开关是直流断路器中承载电流、实现快速分合闸、耐受分闸恢复电压的核心组件,其结构复杂、动作速度快、电气应力严酷、可靠性要求高,因而设计研制难度大,任一环节出现问题均会影响直流断路器乃至柔直电网的安全可靠运行。然而,目前快速机械开关由于存在设计选型不合理、工艺管控不严格、试验考核不完善等问题,导致在实际工程应用中故障率较高。针对已应用于张北柔性直流电网试验示范工程的500 kV直流断路器,分析了直流断路器研制、调试 ...
张涛 +4 more
core +1 more source
LCC-HVDC Converter Station Reactive Power Optimization and Two-Layer Coordination Strategy Research Based on Synchronous Sondenser [PDF]
[Introduction] Under the existing converter station reactive power compensation scheme, the synchronous condenser only provides transient reactive power support, and the AC (Alternating Current) filter undertakes steady-state reactive power compensation ...
Dongqing ZHANG +3 more
core +1 more source
Analysis of Current Situation and Future Development of Offshore Wind Power Industry [PDF]
[Introduction] Under the trend of accelerating the clean transformation of coastal energy and adjusting the industrial structure, offshore wind power will become an important support for the safe, clean and efficient transformation of power energy in ...
Jiachang LIU +3 more
core +1 more source
Research on Optimal Allocation of Multi-Energy Complementary Project of Wind-Solar-Thermal Integration [PDF]
Multi-energy complementary project of wind-solar-thermal integration can play a coordinating and mutually beneficial role among different generations, and is one of the implementation paths for safe and efficient use of renewable energy, and achieving ...
BI Sheng +5 more
core +1 more source