Results 181 to 190 of about 3,915 (205)
Some of the next articles are maybe not open access.
Scheduling Schemes Based on Searching the Aggregated Graph of Operations Planning Sequence
Applied Mechanics and Materials, 2015The searching state space in scheduling of real manufacturing systems with discrete and multi-assortment production is discussed in this paper. The production load is represented by a directed and/or graph called “the aggregated graph of operations planning of the set of orders”.
Krzysztof Kalinowski, Iwona Paprocka
openaire +1 more source
Interfacing aggregate plans and master production schedules via a rolling horizon feedback procedure
Omega, 1987Abstract Aggregate planning and master scheduling are two important levels of a hierarchical production planning process. They serve as the front end of production and operations planning and control systems. It is imperative to have the front end well planned and coordinated.
Chen-Hua Chung, Lee J Krajewski
openaire +1 more source
International Journal of Production Research, 1985
The effects of changing a unit time length of a planning horizon from a month to a week on the optimum planning horizon were examined by calculating the optimum planning horizon through the methods proposed by Nagasawa, Nishiyama, and Hitomi (1982). It was found that the optimum planning horizon decreased by 20-30% in calendar time when the unit time ...
HIROYUKI NAGASAWA +2 more
openaire +1 more source
The effects of changing a unit time length of a planning horizon from a month to a week on the optimum planning horizon were examined by calculating the optimum planning horizon through the methods proposed by Nagasawa, Nishiyama, and Hitomi (1982). It was found that the optimum planning horizon decreased by 20-30% in calendar time when the unit time ...
HIROYUKI NAGASAWA +2 more
openaire +1 more source
2015 18th International Conference on Intelligent System Application to Power Systems (ISAP), 2015
This paper proposes profit maximization plan of a Load Aggregator (LA) through optimal scheduling of imported power with the proper utilization of storage capacity of Electric Vehicles (EVs). The integrations of renewable energy sources are increasing in both generation and distribution networks, which lead to price and demand uncertainties in real ...
Md Shafiullah +2 more
openaire +1 more source
This paper proposes profit maximization plan of a Load Aggregator (LA) through optimal scheduling of imported power with the proper utilization of storage capacity of Electric Vehicles (EVs). The integrations of renewable energy sources are increasing in both generation and distribution networks, which lead to price and demand uncertainties in real ...
Md Shafiullah +2 more
openaire +1 more source
1979
This paper is primarily concerned with what we call ‘the front end’ of an MRPoriented system. In one sense, the front end is the master production schedule, but in a larger sense the master schedule may be thought of as the end product of the disaggregation process where marketing and financial inputs are translated into a schedule of specific end ...
Robert W. Hall, Thomas E. Vollmann
openaire +1 more source
This paper is primarily concerned with what we call ‘the front end’ of an MRPoriented system. In one sense, the front end is the master production schedule, but in a larger sense the master schedule may be thought of as the end product of the disaggregation process where marketing and financial inputs are translated into a schedule of specific end ...
Robert W. Hall, Thomas E. Vollmann
openaire +1 more source
Proceedings of the International Conference on Industrial Engineering and Operations Management, 2022
Gloria Fenny Delavina Simanjuntak +4 more
openaire +1 more source
Gloria Fenny Delavina Simanjuntak +4 more
openaire +1 more source
Aggregate production scheduling by linear programming with variable planning interval
1969"January 1969".
openaire +1 more source
Aspekte von Aggregation und Disaggregation in Advanced Planning and Scheduling-Systemen
2005David Betge, Rainer Leisten
openaire +1 more source