Results 1 to 10 of about 666 (67)
Analysis of Re-Tensioning Time of Anchor Cable Based on New Prestress Loss Model
Considering the interaction among anchor cable, frame beam and rock mass, a new model of prestress loss of anchor cable was established. The accuracy and applicability of the new model were verified by comparing the field monitoring data and the ...
Xiaotian Xie, Keyou Shi
exaly +3 more sources
A New Prestress Loss Calculation Model of Anchor Cable in Pile–Anchor Structure
Pile–anchor structures are widely used in foundation excavation and slope reinforcement due to their safety and reliability. However, the pile–anchor structures have the common problem of the prestress loss of anchor cables, which may reduce the ...
Jinqing Jia, Xiaohua Bao, Guo-Xiong Mei
exaly +3 more sources
Analysis of Three-Core Composite Submarine Cable Damage Due to Ship Anchor
Suspended submarine cables are prone to likely mechanical damages due to ship anchors, which represent a significant threat to the reliability of power transmission and information communication networks.
Tao Zhang, Haibin Tan
exaly +3 more sources
The anchor cable anti-slip pile is a generally-used retaining structure for landslide control. The anchor cable is anchored in the rock mass below the sliding surface, so the anchor cable can be regarded as redundant constraint.
Yanghai SHI, Xianneng WANG
doaj +1 more source
Enlarged Head Pressure-Dispersed Anchor Cable for Foundation Pit Engineering Purposes
The enlarged head pressure-dispersed anchor cable is a new type of anchor cable, and the enlarged head of the anchor solid is a multisegment body with variable cross section.
Chongfu Wu +3 more
doaj +1 more source
Anchor cable tension relaxation with time is a typical problem in the prestressed anchor cable structure used to reinforce slopes. In order to reasonably predict the tension relaxation of anchor cable, based on the interaction among the stable layer ...
Yi DENG, Shiguo XIAO
doaj +1 more source
Aiming at the broken failure of anchor cable in the mining roadway roof during the mining process, the lagging support scheme of anchor cable is proposed.
Xiangyu Wang +3 more
doaj +1 more source
Study on Double-Shear Test of Anchor Cable and C-Shaped Tube
The free section of prestressed anchor cable is a weak part of support. A new supporting structure named Anchor Cable and C-Shaped Tube, which can bear transverse shear force, solves the problem that rock bolt and anchor cable are prone to shear failure ...
Renliang Shan +4 more
doaj +1 more source
Risk Assessment Method for Anchoring Accident of High Voltage Submarine Cable
[Introduction] Cable damage and power failure caused by anchoring damage will cause serious economic loss and social impact. In order to reduce the risk of anchor damage accident of submarine cable, a risk assessment method of high-voltage submarine ...
LUO Chujun +3 more
doaj +1 more source
The prestressed anchor cable is an important component of the anti-slide pile of prestressed anchor cable, but the influences of its arrangement angle on the seismic performance of the anti-slide pile of prestressed anchor cable is not yet clear. To this
WANG Yu 1, 2, ZHENG Tong 1, 2, SUN Rui 1, 2, QI Wenhao 1, 2, LI Linggui 3, CHENG Yang 1, 2, ZHANG Yiming 1, 2
doaj +1 more source