Results 191 to 200 of about 2,771 (221)
Some of the next articles are maybe not open access.

Emergency Operating Procedures (EOPs) for the AP1000 Simulator

Volume 5: Safety and Security; Low Level Waste Management, Decontamination and Decommissioning; Nuclear Industry Forum, 2006
The AP1000 is two-loop 1100 MWe advanced pressurized water reactor (PWR) that uses passive safety features to enhance plant safety and to provide significant and measurable improvements in plant simplification, reliability, investment protection and plant costs.
Yuichi Hayashi   +2 more
openaire   +1 more source

The First AP1000 Fuel Fabrication Line in China

2017
The purpose of this paper is to present a description about the first AP1000 fuel fabrication line in Baotou, China. Owned by China Baotou Nuclear Fuel Corporation (CBNF), the facility construction was started in March, 2012. A capacity of 400 TU/year of fabrication from IFBA pellet fabrication through final fuel assembly, as well as manufacturing of ...
Shuangqing Shi, Zhigang Wang
openaire   +1 more source

Advanced First Core Design for the Westinghouse AP1000

Volume 5: Fuel Cycle and High and Low Level Waste Management and Decommissioning; Computational Fluid Dynamics (CFD), Neutronics Methods and Coupled Codes; Instrumentation and Control, 2009
As the nuclear renaissance is now upon us and new plants are either under construction or being ordered, a considerable amount of attention has also turned to the design of the first fuel cycle. Requirements for core designs originate in the Utilities Requirements Document (URD) for the United States and the European Utilities Requirements (EUR) for ...
openaire   +1 more source

HPF compiler for the AP1000

Proceedings of the 9th international conference on Supercomputing - ICS '95, 1995
Tatsuya Shindo   +4 more
openaire   +1 more source

AP1000 3D Rod Ejection Reactor Core Thermal Analyses

Volume 4: Thermal Hydraulics, 2013
Due to more and more studies were made on fuel and clad failure mode in international nuclear industry, some acceptance criteria of rod ejection accident should be revised in order to consider the fuel and cladding behavior change caused by radiation. Furthermore, along with the rapid development of computer hardware and improvement in physics analysis
openaire   +1 more source

AP1000 Recovery Improvement After ADS Inadvertent Actuation

2012
The AP1000® advanced Pressurized Water Reactor (PWR) is designed and developed by Westinghouse Electric Company. The AP1000® safety approach and design are such that the plant is capable to mitigate all the Design Basis Accidents (DBAs) relying only on passive safety systems with no AC power and no or very limited operator action.
D. Lioce   +3 more
openaire   +1 more source

Safety assessment of AP1000: Common transients, analysis codes and research gaps

Nuclear Engineering and Design, 2021
Samuel Abiodun Olatubosun   +2 more
exaly  

Vulnerability assessment of AP1000 NPP under mainshock-aftershock sequences

Engineering Structures, 2020
Avinash Gautam, Zhao Chunfeng
exaly  

Home - About - Disclaimer - Privacy