Results 281 to 290 of about 2,196,882 (335)
Some of the next articles are maybe not open access.
Computing Average Run Lengths of Exponential EWMA Charts
Journal of Quality Technology, 2000An exponential EWMA chart is useful for monitoring the mean β of interarrival times of nonconforming items in many manufacturing processes.
Gan, F.F., Chang, T.C.
openaire +1 more source
Average run length comparison of multivariate control charts
Journal of Statistical Computation and Simulation, 2001In this paper we use Monte Carlo Simulation methodology to compare the effectiveness of five multivariate quality control methods, namely Hotelling T 2, Multivariate Shewhart Char, Discriminant Analysis, Decomposition Method, and Multivariate Ridge Residual Chart-developed by Authors-, for controlling the mean vector in a multivariate process.
Amir Javaheri, Ali A. Houshmand
openaire +1 more source
Computing Average Run Lengths for Exponential CUSUM Schemes
Journal of Quality Technology, 1994Exponentially distributed observations arise naturally in the context of monitoring the rate of occurrences of events like nonconforming items.
F. F. Gan, K. P. Choi
openaire +1 more source
On Average Run Lengths of Control Charts for Autocorrelated Processes
Methodology and Computing in Applied Probability, 2009zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Chang, Yung-Ming, Wu, Tung-Lung
openaire +1 more source
On Distribution and Average Run Length of a Two-Stage Control Process
Methodology and Computing in Applied Probability, 2022zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Hsing-Ming Chang, James C. Fu
openaire +1 more source
AVERAGE RUN LENGTHS FOR MOVING AVERAGE CONTROL CHARTS
Probability in the Engineering and Informational Sciences, 1999We are interested in E [N], the mean time until the most recent k values of a sequence of independent and identically distributed random variables exceeds a specified constant. Using recent results, we present a simulation procedure for determining E [N]. These results are also used to obtain upper and lower bounds for E [N]. These bounds, however,
openaire +1 more source
Average Run Length Computations for the Three-Way Chart
Communications in Statistics - Simulation and Computation, 2004An integral equation for the average run length of the Three-Way control chart is analytically derived, and a numerical method for solving it is presented. Useful tables of the results of run length computations are provided for shifts in the process mean and standard deviation.
Maria E. Calzada, Stephen M. Scariano
openaire +1 more source
Average Run Lengths of Exponentially Weighted Moving Average Control Charts
Journal of Quality Technology, 1987A computer program is presented that calculates the average run length of exponentially weighted moving average charts for controlling the mean of a normal process...
openaire +1 more source
The computation of average run length and average time to signal: an overview
Journal of Statistical Computation and Simulation, 2013Control charts are widely used in industries to monitor a process for quality improvement. Evaluation of the average run length (ARL) or average time to signal (ATS) plays an important role in the design of control charts and performance comparison. In this paper, we review several basic and popular procedures, including the Markov chain and integral ...
Zhonghua Li +3 more
openaire +1 more source
Average Run Lengths in Cumulative Chart Quality Control Schemes
Technometrics, 1961Average run-lengths are evaluated for V-mask quality control schemes based on cumulative deviation charts when the observations are Normally distributed and either independent or members of a certain serially correlated class.
P. L. Goldsmith, H. Whitfield
openaire +1 more source

