Results 211 to 220 of about 284,953 (268)
System aspects on safeguards for the back-end of the Swedish nuclear fuel cycle
openaire +1 more source
Some of the next articles are maybe not open access.
Related searches:
Related searches:
The Back End of the Fusion Materials Cycle
Fusion Science and Technology, 2009Within the framework of the International Energy Agency, an international collaborative study on fusion radioactive waste has been initiated to examine the back end of the materials cycle as an imp...
ZUCCHETTI, MASSIMO +6 more
openaire +2 more sources
Back-end of nuclear fuel cycle in China
Progress in Nuclear Energy, 2012Abstract Nuclear status and expansion in China are overviewed in the present paper. The nuclear electricity capacity was adjusted form 40 GWe–70 GWe by 2020. The target of nuclear electricity capacity will reach 200 GWe by 2030 and 400 GWe by 2050. Based on the nuclear energy expansion, the evolution of spent fuel was anticipated. The accumulation of
Jing Chen +3 more
openaire +1 more source
The Back-End of Fusion Materials Cycle: Recycling, Clearance and Disposal
Fusion Science and Technology, 2009In order to maximize the environmental benefits of fusion power generation, it is important to clearly define the parameters governing the back-end of the materials cycle.
ZUCCHETTI, MASSIMO +6 more
openaire +2 more sources
An integrated approach to the back-end of the fusion materials cycle
Fusion Engineering and Design, 2008Abstract In order to maximise the environmental benefits of fusion power generation, it is important to clearly define the parameters governing the back-end of the materials cycle. A fusion-specific, unique approach is necessary and needs to be developed. Recycling of materials and clearance (i.e. declassification to non-radioactive material) are the
ZUCCHETTI, MASSIMO +6 more
openaire +2 more sources
The Overlooked Back End of the Nuclear Fuel Cycle
Science, 2011The recent accident at the Fukushima nuclear power plant reinforces the need for renewed thinking about nuclear-waste storage and disposal.
openaire +1 more source
Utility Optimization Model of Fuel Cycle Back-End Services
Nuclear Technology, 1978Optimization of the back-end services of the fuel cycle is solved by linear programming. A mathematical model governs the flow of fissile material from the reactor to spent fuel storages, to reproc...
H. Kaikkonen +2 more
openaire +1 more source
A Study on the Once-Through Back-End Fuel Cycle Scenario
ASME 2009 12th International Conference on Environmental Remediation and Radioactive Waste Management, Volume 1, 2009There are three options for spent fuel management, recycle, once-through and wait and see. The national policy for spent fuel in Korea is “wait and see” and it has to be clearly decided for spent fuel management. The final disposal is the last stage of the fuel cycle and it is essential even though the recycling option will be chosen for spent fuel ...
Yoon Hee Lee +3 more
openaire +1 more source
Critical issues with 'minor league' nuclear infrastructures: the back end of the life cycle
International Journal of Critical Infrastructures, 2008The paper attempts to draw attention to a number of issues that may go underplayed on the agenda of the critical infrastructure analysts concerned with risks: the vulnerabilities induced by nuclear research facilities facing decommissioning. The notion that the 'small nuclear' facility may show, in such circumstances, sizeable risks, even in comparison
Dan V. Vamanu +3 more
openaire +1 more source
Nuclear Technology, 1990
The back end of the nuclear fuel cycle has been analyzed under current conditions in the United States, including the constraints imposed by the Nuclear Waste Policy Act of 1982 and its amendments. The scenarios for two closed cycles, a regular reprocessing cycle and a reprocessing scheme with cesium and strontium fractionation, are described.
Jordi Roglans-Ribas, Bernard I. Spinrad
openaire +1 more source
The back end of the nuclear fuel cycle has been analyzed under current conditions in the United States, including the constraints imposed by the Nuclear Waste Policy Act of 1982 and its amendments. The scenarios for two closed cycles, a regular reprocessing cycle and a reprocessing scheme with cesium and strontium fractionation, are described.
Jordi Roglans-Ribas, Bernard I. Spinrad
openaire +1 more source

