Results 241 to 250 of about 394,780 (333)
Some of the next articles are maybe not open access.

Behaviour of bored piles in sand

International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, 1974
The paper presents the results of load tests on instrumented bored piles. Field measurements of load transfer in sand were made and design criteria are suggested for computing the tip and the side resistance of bored piles in sand as a function of soil properties.
Fadlo T. Touma, Lymon C. Reese
openaire   +1 more source

Piling and Boring

1976
Piled foundations constitut the most commonly applied system of providing a suitable base on ground of poor bearing capacity for heavy buildings and other important structures, like bridges, towers, quay walls, jetties etc. Broadly speaking, piles fall into two main categories, namely preformed and cast-in-situ. For preformed piles, reinforced concrete,
Günter Wallnig, Harry Evered
openaire   +1 more source

Performance evaluation of post-grouting for bored piles installed in inhomogeneous gravel pebble stratum overlaid by deep and soft soil layers

Geomechanics and Geoengineering, 2023
To study the behaviours of post-grouted piles installed in an uneven pebble bearing layer overlaid deep and soft soil layer in Wenzhou, China, static loading field tests of three bored post-grouted piles were conducted, considering the key design ...
J. Wang, T. Jin, W. Qin, F. Zhang
semanticscholar   +1 more source

Fundamental Mechanisms of Concrete Bleeding in Bored Piles

The International Conference on scientific innovations in Science, Technology, and Management, 2023
Concrete bleeding in bored pile scan cause substantial defects such as channelling or air pockets in pile shaft of diaphragm walls. The repair of such damage can be costly and time consuming.
Saji Lekshman K. L
semanticscholar   +1 more source

Bored and screwed piles

2005
Piling is one of the most necessary and powerful construction techniques applied in geotechnical engineering. The efficiency of bored piles (where soil is retrieved) and screwed piles (where soil is displaced) results from the interaction between the performance of the drilling equipment and the modifications created by the drilling process to the soil
Katzenbach R., Schmitt A.
openaire   +1 more source

Bored compaction piles

Batiment International, Building Research and Practice, 1976
Cast in-situ bored piles of a special type developed at the Central Building Research Institute, Roorkee, India, have proved particularly useful for loose soils with a high water table as well as in other situations. Their construction and applications are described in this article.
Dinesh Mohan, G. S. Jain, M. P. Jain
openaire   +1 more source

Full-scale performance testing of bored piles with retaining walls in high cutting slope

Transportation Geotechnics, 2021
This study aims to verify the suitability and reinforcement behavior of newly designed bored piles with retaining walls (BPRWs) for cutting-slope stabilization in the Tibet Plateau.
Chong-lei Zhang   +3 more
semanticscholar   +1 more source

LARGE BORED PILES

1966
This title is part of the ICE Publishing complete digital collection - helping ensure access to essential engineering content from past to present. Proceedings of a symposium organized with the Reinforced Concrete Association held in February 1966 This title is not currently available in print.
openaire   +1 more source

Some Experiences with Bored Piling

Journal of the Soil Mechanics and Foundations Division, 1967
Some reasons for necking and waisting of bored piles in weathered inplace soils are given. Results of Van Weele’s tests are compared with pullout tests to determine skin friction. Results of lateral load tests on vertical piles are described. Van der Veen’s method of ultimate load determination was found satisfactory for simple compression tests ...
openaire   +1 more source

Simulation of bored pile construction

Proceeding of the 2001 Winter Simulation Conference (Cat. No.01CH37304), 2002
The installation of pile foundations is complicated by an enormous number of problems. They include unseen subsurface obstacles, lack of contractor experience, and site planning. These major problems and other minor ones make it difficult for the estimator to evaluate the piling project productivity and cost. Therefore, this study is designed to assess
T.M. Zayed, D.W. Halpin
openaire   +1 more source

Home - About - Disclaimer - Privacy