Results 101 to 110 of about 33,740 (198)

Application of nD BIM Integrated Knowledge-based Building Management System (BIM-IKBMS) for Inspecting the Post-construction Energy Efficiency [PDF]

open access: yes, 2014
The evolution of construction industry towards sustainability highlighted the absolute necessity to inspect sustainable performances throughout the post-construction building lifecycle.
GhaffarianHoseini, A   +2 more
core  

Gross motor performance of infants with an at‐home wearable measurement and the Alberta Infant Motor Scale: A concurrent validity study

open access: yesDevelopmental Medicine &Child Neurology, EarlyView.
Abstract Aim To evaluate the concurrent validity of assessing infants' gross motor performance with an at‐home wearable measurement versus the Alberta Infant Motor Scale (AIMS). Method This observational study used a new multi‐sensor wearable Motor Assessment of Infants with a JUmpsuit (MAIJU) for 67 at‐home measurements of 42 infants (60% males; mean ...
Manu Airaksinen   +5 more
wiley   +1 more source

Analysis Framework for the Interaction Between Lean Construction and Building Information Modelling [PDF]

open access: yes
Building with Building Information Modelling (BIM) changes design and production processes. But can BIM be used to support process changes designed according to lean production and lean construction principles? To begin to answer this question we provide
Dave, Bhargav   +3 more
core  

Suitability of BIM for enhancing value on PPP projects for the benefit of the public sector [PDF]

open access: yes, 2013
Collaborative integrated working and stakeholder’s interest have been among key drivers that underpin and encourage the use of Building Information Modelling (BIM) within the AEC industry.
Ganah, Abdulkadir, John, Godfaurd Adjaie
core  

Solar Analysis Using Building Information Modelling with the Glass Box Method in Jakarta [PDF]

open access: yes, 2015
The utilisation of Building Information Modelling (BIM) focuses more on the Schematic Design or Technical Design phase, while the Preliminary or the Conceptual design is pretty much skipped.
Tomasowa, R. (Riva)
core   +2 more sources

Digital platform strategies from an incumbent perspective: An exploration of contextual factors and connectors

open access: yesEuropean Management Review, EarlyView.
ABSTRACT Multi‐sided platform (MSP) models have become more relevant for incumbent companies, requiring them to develop MSP engagement strategies. This study sheds light on the complex process incumbents undergo in developing platform strategies. Adopting an inductive research design, we conducted interviews with 37 decision‐makers across 35 incumbent ...
Lukas Zechel, Vivek K. Velamuri
wiley   +1 more source

The changing perception in the artefacts used in the design practice through BIM adoption [PDF]

open access: yes, 2010
When CAD (Computer Aided Design) was generally adopted in the early 1990’s, the hand drawn process was replaced with the CAD drawing but the nature of the artefacts / deliverables and the exchanges of information between disciplines remained ...
Arayici, Y   +3 more
core  

A Framework to Investigate the Effects of Observation Error on Neural Network Predictions of Fish Age

open access: yesFish and Fisheries, EarlyView.
ABSTRACT Technological innovations for predicting fish age represent a paradigm shift from conventional age estimation methods used in fisheries science. Recently developed secondary methods rely on models trained on conventional age estimates, derived from subjective interpretation of growth patterns and a biological property of the fish to predict ...
Derek W. Chamberlin   +11 more
wiley   +1 more source

Automatic detection of doors and windows using point clouds in the context of as-built BIM [PDF]

open access: yesThe International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences
The automation of 3D modelling from point clouds has emerged as a highly intriguing research area, offering significant potential value in the context of scan-to-BIM (Building Information Modelling) process.
S. Boudarbala   +5 more
doaj   +1 more source

Problem-based learning: enhancing students learning of building information modelling [PDF]

open access: yes, 2018
Building Information Modelling (BIM) is an innovative collaborative process underpinned by digital technologies introduced to improve project performance in the Architecture, Engineering and Construction (AEC) industry.
Chukwudi, Obi   +2 more
core  

Home - About - Disclaimer - Privacy