Results 151 to 160 of about 3,002 (170)
Some of the next articles are maybe not open access.
Phase II Existing Conditions Assessment of Building 5123, Camp Bullis, Texas
2009This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Delivery Order 013, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). The Phase I and Phase II ECA reports have been prepared to conform to the Army Alternate Procedures (AAP ...
openaire +1 more source
Phase I Existing Conditions Assessment of Building 5122, Camp Bullis, Texas
2009This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of ...
openaire +1 more source
Vertebrate cells differentially interpret ciliary and extraciliary cAMP
Cell, 2021Sára Bileková, Semil P Choksi, Wan Li
exaly
Epac: a new cAMP target and new avenues in cAMP research
Nature Reviews Molecular Cell Biology, 2003Johannes L Bos
exaly
The protein kinase A anchoring protein mAKAP coordinates two integrated cAMP effector pathways
Nature, 2005Kimberly L Dodge-Kafka +2 more
exaly
Was Bullis Fever Actually Ehrlichiosis?
JAMA - Journal of the American Medical Association, 1988exaly
cAMP detection methods in HTS: selecting the best from the rest
Nature Reviews Drug Discovery, 2004exaly

