Results 111 to 120 of about 1,794 (138)

Short-term hydro generation scheduling of Three Gorges–Gezhouba cascaded hydropower plants using hybrid MACS-ADE approach

open access: closedEnergy Conversion and Management, 2013
Abstract Short-term hydro generation scheduling (STHGS) aims at determining optimal hydro generation scheduling to obtain minimum water consumption for one day or week while meeting various system constraints. In this paper, the STHGS problem is decomposed into two sub-problems: (i) unit commitment (UC) sub-problem; (ii) economic load dispatch (ELD ...
Li Mo   +3 more
openaire   +2 more sources

Method for LSTM-Based Cascade Hydropower Plant Scheduling

open access: closed2021 33rd Chinese Control and Decision Conference (CCDC), 2021
Zhi Cai, Guofang Zhang, Yi Lu, Yuxuan Li
openaire   +2 more sources

Long-Term Optimal Scheduling of Cascade Hydropower Plants in the Primary Market: The Wujiang River Case

open access: closedWorld Environmental and Water Resources Congress 2018, 2018
Rui Cao   +4 more
openaire   +2 more sources

Approaches to the Cascade Hydropower Plants Optimum Operation for Forming the Day-Ahead Electricity Market Schedule

open access: closed
Ihor Blinov   +6 more
openaire   +2 more sources

An ultra-short-term scheduling model for cascade hydropower regulated by multilevel dispatch centers suppressing wind power volatility

International Journal of Electrical Power and Energy Systems, 2022
Xinyu Wu, Shengli Liao, Chuntian Cheng
exaly  

Home - About - Disclaimer - Privacy