Optimal operation of cascade hydropower station based on interior point method

open access: yesEnergy Reports, 2022
The optimal operation of cascade hydropower station is a hydropower system based on the optimal operation method of a single reservoir and considering the water relations between reservoirs.
Shuai Feng, Yun Zhu
doaj   +4 more sources

SVM-based Implicit Stochastic Scheduling Mode for Cascade Hydropower Stations [PDF]

open access: yesMATEC Web of Conferences, 2018
In view of the uncertainty of inflow of cascade reservoirs, an implicit stochastic joint scheduling function model for cascade hydropower stations based on support vector machine (SVM) was established.
Wang Qinhui   +3 more
doaj   +2 more sources

Study on the Variation Law of Water Consumption Rate of Cascade Hydropower Station under Different Conditions

open access: yesEnergies
The water consumption rate for hydropower station power generation is an important index of the economic operation of hydropower stations, which has been widely considered and applied in the production practice of hydropower stations and has great ...
Xueshan Ai   +6 more
doaj   +3 more sources

Review on the Method of Compensation Benefit Allocation for Cascade Hydropower Stations

open access: yesRenmin Zhujiang, 2020
Under the model of cascade rolling development,there are significant compensation benefits in the joint operation of cascade hydropower stations.Scientific and reasonable allocation of compensation benefits becomes the key point to realize joint optimal ...
LI Yinghai   +3 more
doaj   +1 more source

Establishment and evaluation of operation function model for cascade hydropower station

open access: yesWater Science and Engineering, 2010
Toward solving the actual operation problems of cascade hydropower stations under hydrologic uncertainty, this paper presents the process of extraction of statistical characteristics from long-term optimal cascade operation, and proposes a monthly ...
Chang-ming Ji, Ting Zhou, Hai-tao Huang
doaj   +2 more sources

Short-term peak shaving model of cascade hybrid pumped storage hydropower station retrofitted from conventional hydropower

open access: yesInternational Journal of Electrical Power & Energy Systems
The integration of pumped storage units with conventional cascade hydropower to form a cascade hybrid pumped storage hydropower station (CHPHPS) is considered one of the effective approaches to expedite the development of pumped storage.
Bin Luo   +4 more
doaj   +3 more sources

Practices of Hydro-Meteorological Support During Construction Period of Largehydropower Project [PDF]

open access: yesE3S Web of Conferences, 2021
The hydrological and meteorological hydro-meteorological support is one important part of the hydropower construction. Accidents caused by flood and rainstorm during construction will be reduced effectively with the help of reliable hydrological and ...
Hui CAO   +4 more
doaj   +1 more source

Clearing Model for Day-ahead Market Considering Hydraulic Coupling Relationship of Multi-operator Cascade Hydropower Stations [PDF]

open access: yesE3S Web of Conferences, 2021
There is a hydraulic coupling relationship between the upstream and downstream of cascade hydropower stations, and they usually belong to different stakeholders.
Ningxin Huang, Zhaoxia Jing
doaj   +1 more source

Susceptibility Evaluation of Debris Flow Disaster in Plateau Hydropower Cascade Development Reservoir Area [PDF]

open access: yesNature Environment and Pollution Technology, 2023
The Rumei Hydropower Station is a typical cascade hydropower development project in a plateau area. The dam site is located in an area with complex topography, lithology, and geological structure.
Feng Yang, Xudong Hu, Zhenyao Xia, Lei Cui and Qi Yang
doaj   +1 more source

A Load-Based Method for Peak Operations of Cascaded Hydropower Stations

open access: yesIOP Conference Series: Earth and Environmental Science, 2021
Abstract Short-term generation scheduling of cascade hydropower stations has always been one of the core tasks of power system operations. However, with the rapid increase of the number of power stations and the complexity of operation constraints, it is facing more and more challenges to quickly obtain practical day-ahead generation ...
Sen Wang, Jianjian Shen, Shanzong Li
openaire   +1 more source