Results 211 to 220 of about 87,998 (249)
Some of the next articles are maybe not open access.

Performance of CMMs

CIRP Annals, 1988
The current development in manufacturing processes trend to flexible automation combined with higher accuracy. This requires flexible, automated and adequately accurate measuring instruments for inspection, toe. Today's CNC-co-ordinate measuring machines (CMMs) are capable, first and foremost, of fulfilling these requirements.
H. Kunzmann, F. Wäldele
openaire   +1 more source

People CMM and team CMM, nieuwe loten aan de CMM-stam

Informatie, 2002
PSP (People Software Process) en TSP (Team Software Process) zijn twee nieuwe, nog niet zo bekende CMM-producten. Wat zijn PSP en TSP, wat kan een organisatie ermee en wat zijn de ervaringen tot nu toe?
Heemstra, F.J., Kusters, R.J.
openaire   +3 more sources

CMM Acquisition Chain

2000
To calculate a CMM uncertainties we have studied the CMM acquisition chain. We propose to model the CMM. The initialisation procedure is very important for the control of the measurement quality. We show the main operations required for a use of CMM. This work is the roots of our study on CMM uncertainties.
I. Amara, J. M. Linares, J. M. Sprauel
openaire   +1 more source

CMM CESSDA Metadata Model

2023
This is the public version of the CESSDA Metadata Model (CMM). Please send your requests to the CESSDA Metadata Office via metadata-office@cessda.eu. Guidelines for the usage of and best practice for the CMM can be found in the respective User Guide.
Akdeniz, Esra, Moilanen, Katja
openaire   +1 more source

CMM Trajectory Generation

2000
A Computer Aided Inspection Planning (CAIP) system is a process planner able to automatically plan all the operations related to dimensional inspection of mechanical parts by a co-ordinate measuring machine. In this paper we discuss a interesting CAIP aspect: the probe path generation.
POLINI, Wilma, MORONI G., RASELLA M.
openaire   +3 more sources

The Effective Combination of IPD and CMM: IPD-CMM Process

2010 Second World Congress on Software Engineering, 2010
Started with the overview of IPD and CMM, based on the detailed analysis of the relationship between them, the article discussed how the IPD and CMM could be combined effectively and be formatted into the IPD-CMM integrated process, ended with a summary of IPD-CMM process of implementation considerations.
null Yue Jia, null Rui Han
openaire   +1 more source

Towards the Intelligent CMM

CIRP Annals, 2002
Abstract ‘Intelligent’ CMMs are likely to become the next generation of CMMs. In this paper the main features of an intelligent CMM are proposed. In operation, the geometric and measuring information of the part would be extracted from its CAD file.
Zhang, G. X.   +5 more
openaire   +2 more sources

An Agile CMM

2004
This paper describes the process for developing software in a highly volatile environment. The process is based on eXtreme Programming (XP) and Scrum, to combine engineering practices with management directives based on the Capability Maturity Model (CMM) Level 2.
Erik Bos, Christ Vriens
openaire   +1 more source

CMM Users Positive

Machinery, 2019
Mitutoyo CMM supports Quartztec Europe’s growing demand; Goodfabs selects Aberlink CMM after market analysis; fuel cell measurement demands; plus industry & product news in brief
openaire   +1 more source

Generalized regression for CMMs

International Journal of Mathematical Education in Science and Technology, 1986
This paper modifies the usual meaning of regression from ‘minimizing the sum of squared distances’ to ‘minimizing the sum of square perpendicular distances’. With this modified definition, the best‐fit plane, circle, and sphere may be meaningfully considered.
R. Davison, J. A. Bland
openaire   +1 more source

Home - About - Disclaimer - Privacy