Results 271 to 280 of about 19,357 (310)
Some of the next articles are maybe not open access.
Machine scheduling with job delivery coordination
European Journal of Operational Research, 2004zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Yung-Chia Chang, Chung-Yee Lee
openaire +3 more sources
Evaluation of Coordinated Grid Scheduling Strategies
2009 11th IEEE International Conference on High Performance Computing and Communications, 2009Grid computing has emerged as a way to share geographically and organizationally distributed resources that may belong to different institutions or administrative domains. In this context, the scheduling and resource management is usually performed by a grid resource broker.
Ivan Rodero +2 more
openaire +1 more source
Coordination mechanisms for parallel machine scheduling
European Journal of Operational Research, 2012zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Kangbok Lee +2 more
openaire +2 more sources
Scheduling and coordination in manufacturing enterprise automation
Proceedings 2000 ICRA. Millennium Conference. IEEE International Conference on Robotics and Automation. Symposia Proceedings (Cat. No.00CH37065), 2002Manufacturing enterprise automation was focused on factory level where scheduling is a key issue in the past. As more and more companies are relying on their business partners or suppliers, the coordination of activities through the chain of suppliers becomes critical to quickly respond to changing market conditions.
Haoxun Chen, Peter B. Luh
openaire +1 more source
Scheduler Vulnerabilities and Coordinated Attacks in Cloud Computing
2011 IEEE 10th International Symposium on Network Computing and Applications, 2011In hardware virtualization a hypervisor provides multiple Virtual Machines (VMs) on a single physical system, each executing a separate operating system instance. The hypervisor schedules execution of these VMs much as the scheduler in an operating system does, balancing factors such as fairness and I/O performance.
Fangfei Zhou +3 more
openaire +1 more source
Scheduling coordination problems in supply chain planning
Annals of Operations Research, 2007zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Stephan Kreipl, Jörg Thomas Dickersbach
openaire +2 more sources
Optimal Coordination Mechanisms for Unrelated Machine Scheduling
Operations Research, 2015We investigate the influence of different algorithmic choices on the approximation ratio in selfish scheduling. Our goal is to design local policies that minimize the inefficiency of resulting equilibria. In particular, we design optimal coordination mechanisms for unrelated machine scheduling, and improve the known approximation ratio from Θ(m) to Θ ...
Yossi Azar +4 more
openaire +1 more source
Coordinating selfish players in scheduling games
2015We investigate coordination mechanisms that schedule n jobs on m unrelated machines. The objective is to minimize the makespan. It was raised as an open question whether it is possible to design a coordination mechanism that has constant price of anarchy using preemption. We give a negative answer. Next we introduce multi-job players that control a set
openaire +3 more sources
Scheduling and coordination of distributed design
IFAC Proceedings Volumes, 1999Abstract A short product design cycle is critical for the success of companies in the era of time-based competition especially when companies are distributing design activities across regions to better penetrate local markets. Effectively managing distributed design activities, however, is extremely difficult because of intrinsic uncertainties of the
Feng Liu, Peter B. Luh, Bryan Moser
openaire +1 more source
Coordinate Marketing Schedule with Construction Schedule
1991In order to avoid holding costs, it is necessary to coordinate the rent-up or sales of the units with the completion of construction and obtaining the Certificate of Occupancy. Failure to rent or sell the units immediately upon completion results not only in holding costs and revenue, but also risks vandalism in vacant finished units.
openaire +1 more source