Results 171 to 180 of about 210,242 (229)
Some of the next articles are maybe not open access.
Scheduling Yard Cranes Considering Crane Interference
2011Automated stacking cranes form the heart of modern container terminals. Hence, their productivity has a major influence on the performance of the terminal. In the first part of this paper, the yard crane scheduling problem and its practical relevance from the point of view of the Container Terminal Altenwerder (CTA) in Hamburg, Germany, is described ...
Ulf Speer +2 more
openaire +1 more source
Nonlinear Optimal Control for the Underactuated Double-Pendulum Overhead Crane
Journal of Vibration Engineering & Technologies, 2023G. Rigatos
semanticscholar +1 more source
Disturbance employment-based sliding mode control for 4-DOF tower crane systems
, 2021Meng-Hua Zhang, Xin Jing, Zaixing Zhu
semanticscholar +1 more source
Digital-Twin Driven Energy-Efficient Multi-Crane Scheduling and Crane Number Selection in Workshops
Journal of Cleaner Production, 2022Ning Zhao, Xuening Pu, Zhuorui Fu
exaly
Cooperative control of a nonuniform gantry crane with constrained tension
at - Automatisierungstechnik, 2016Wei He, S. Ge
semanticscholar +1 more source

