Results 141 to 150 of about 357 (183)
Crane oiler dies when crushed between a crawler crane cab and track in California. [PDF]
A 38-year-old male crane oiler (victim) died after being crushed between the underside of the cab (house) of a 250-ton crawler crane and its track.
openaire +2 more sources
Some of the next articles are maybe not open access.
Related searches:
Related searches:
Bearing capacity of soils for crawler cranes
Canadian Geotechnical Journal, 2008Few studies have been carried out on the bearing capacity of soils for crawler cranes. Directly applying the bearing capacity equations used for shallow foundations to cranes often leads to conservative design. The total settlement is of less concern for cranes than for buildings, and cranes can normally tolerate larger differential settlements ...
Xiteng Liu +2 more
openaire +1 more source
A Search Strategy for Motion Planning of Unmanned Crawler Crane
2019 7th International Conference on Control, Mechatronics and Automation (ICCMA), 2019The motion planning for unmanned crawler crane (UCC) whose initial and goal described accurately in workspace was challenging. The difficulty dues to the fact that the initial and goal produce low-dimensional self-motion manifolds, which rendered the search of planners bypassing the self-motion manifolds.
Yuanshan Lin +4 more
openaire +1 more source
Study and Implementation of a Cooperative Hoisting for Two Crawler Cranes
Journal of Intelligent & Robotic Systems, 2015Dual-crane cooperative hoisting is necessary for heavy loads and certain equipment in petrochemical plants, but most dual-crane hoisting are carried out by two drivers commanded under one or more banksmen, thus leading to low hoisting efficiency and bad hoisting quality.
Yanming Li +3 more
openaire +1 more source
Level luffing control system for crawler cranes
Automation in Construction, 2004A level luffing control system for crawler cranes has been developed. By using this system, an operator can safely keep suspended loads level at elevated spots or on sites where visual operation is impossible. This system consists of a microcomputer-based controller, sensors (boom angle, rope length, boom lever pressure, engine speed) and hydraulic ...
Hirokazu Araya +3 more
openaire +1 more source
Crawler Cranes Modeling Method Based on OGRE
Advanced Materials Research, 2010According to the crawler crane’s structure and the scene management principle of OGRE (Object-Oriented Graphics Rendering Engine), this paper presents a new 3D parameterized modeling method of crawler cranes. By integrating the interactive modeling using 3DSMAX and the geometrical graphics modeling, the new method can solve the problem about rendering ...
Di Wu +4 more
openaire +1 more source
Development of Automatic Assembly System for Crawler Crane Based on Unity3D
2024 5th International Conference on Artificial Intelligence and Electromechanical Automation (AIEA)Yulan Wei
exaly +2 more sources
Path Planning for Crawler Crane Using RRT*
2012Lift path planning is a key subtask in preparing lift plan. Many researchers have concerned the topic of automated path planning for crane lifts. Previous studies provided some exact approaches or optimization methods to solve the problem. However, these approaches failed when they handle the problem with high DOFs.
Yuanshan Lin +4 more
openaire +1 more source
Design and Realization of Crawler Crane’s Lifting Simulation System
Volume 3: 28th Computers and Information in Engineering Conference, Parts A and B, 2008Most construction projects rely on crawler cranes to perform lifting and hoisting activities. In practice, crawler cranes are managed based on demand, urgency, and prioritized work tasks that must be performed within a set period of time in the field. A lifting plan is needed to make.
Di Wu +3 more
openaire +1 more source

