Results 51 to 60 of about 357 (183)
RESEARCH ON STRESS ANALYSIS OF PINNED CONNECTION BASED ON PHOTOELASTIC EXPERIMENT
There are no rules and standards relating to the calculation of pinned connection because of its partial structure and internal stress state are very complex.
QU FuZheng +4 more
doaj
Staged ecologies: Aesthetics, nature and infrastructure in the late‐modern metropolis
Short Abstract This paper examines the relationship between urban nature and landscape design within a £1.5 billion regeneration project that is currently unfolding in Thamesmead, a town in south‐east London. It develops the notion of ‘staged ecologies’ to examine how urban nature is being spatially and aesthetically arranged across the town's ...
Zuhri James
wiley +1 more source
The Finite Element Analysis of Weight Control Agency Belonging to Crawler Crane Machine
The weight control agency of crawler crane machine may be in the problem of inadequate strength in engineering applications. It will be analyzed and improved design by finite element.
Xian Bin Du +5 more
core +1 more source
Pembangunan infrastruktur jalan tol bertujuan untuk memperlancar transportasi dan meningkatkan perekonomian negara. Salah satu jalan tol yang masih dalam pengerjaan adalah proyek Pembangunan Jalan Tol Pasuruan – Probolinggo yang memiliki panjang 31,3 km.
Ronald Dwi Pratama, ANDHIKA
core
Dismantling of Reinforced Concrete Using Steam Pressure Cracking System: Drilling and Crack Propagation. [PDF]
Kamiya O +13 more
europepmc +1 more source
ANALISIS DAN DESAIN PROSES REKONDISI CRAWLER CRANE DALAM PENINGKATAN MANAJEMEN OPERASIONAL PT GRANT ARTHA DISON
Indra, M.Si., Harry, ARTHA SUHERI, TEDDY
core
ANALISIS PERBANDINGAN METODE CRAWLER CRANE DAN LAUNCHER GANTRY PADA PELAKSANAAN ERECTION PCI GIRDER [PDF]
Pembangunan infrastruktur jalan tol di Indonesia menuntut metode konstruksi yang efisien dari segi waktu dan biaya. Salah satu pekerjaan utama pada pembangunan jembatan tol adalah erection Presstressed Concrete I - Girder, yang dapat dilakukan ...
Odih Supratman, - +2 more
core
The infrastructure growth in Indonesia, particularly on the island of Java, has surged significantly up to the year 2024, one of which includes the Trans-Java toll road project.
Suci, R.A. +3 more
core +1 more source
Ecer, Fatih/0000-0002-6174-3241Choosing the proper and best crawler crane is a complicated decision-making issue due to several conflicting criteria and vagueness in the construction and project logistics industries.
Saha, Abhijit +2 more
core +1 more source
ANALISA STABILITAS WORK BARGE ELANG BIRU 505 AKIBAT PENGARUH OPERASIONAL CRAWLER CRANE DI ATASNYA DI LEPAS PANTAI KALIMANTAN TIMUR [PDF]
Work Barge is an important infrastructure to support Petroleum and Natural Gas (MIGAS) drilling activity in swamp, river, shore and offshore. In the work barge, all of the activities move accordance with the plan. The well be in production after the work
Ari Wibawa, Budi Santosa
core

