Results 141 to 150 of about 15,954,263 (302)
An Edible Chitosan‐Based Acoustic Sensor for Sound‐Responsive Actuation in Edible Robots
This study introduces an edible acoustic sensor for robotic food and edible robotics. Built from a chitosan piezoelectric film between gold electrodes, the sensor enables acoustic communication through ON/OFF keying. Integrated into an edible robot with pneumatically actuated arms and neck, it responds to high‐frequency tones.
Valerio Francesco Annese +8 more
wiley +1 more source
APPLYING PERT AND CRITICAL PATH METHOD IN HUMAN RESOURCE TRAINING [PDF]
The subject of the article is referring to the modelling and simulating of the formation of human resources by applying the PERT/CPM (Program Evaluation and Review Technique/Critical Path Method) and the taking into consideration of some risks associated
Eugen ROTARESCU
core
Coordinated Architectural and Chemical Reinforcement in the Crushing Mandible of a Soldier Termite
The crushing mandible of a soldier termite withstands substantial biting loads despite lacking mineral. Its cuticle is partitioned: convex teeth pair hardness and zinc enrichment with aligned chitin fibers for contact durability, while stiffer concave regions between teeth carry bending loads.
Andrew Tran Nguyen +16 more
wiley +1 more source
Shape-shifting Robot Path Planning Method Based on Reconfiguration Performance
A shape-shifting robot "AMOEBA-I" has diverse configurations, and the accessibility of the robot can be reinforced in the narrow space by changing the configurations.
Li B(李斌) +2 more
core
Memristive‐Gated RC‐Delay Synaptic Transistors for Time‐Encoded Analog in‐Memory Computing
A Memristive‐Gated Transistor for Time‐Encoded Analog In‐Memory Computing — By exploiting the RC delay of a self‐rectifying interface‐type memristor, nonlinear I–V distortion is structurally bypassed, enabling 3‐bit nonvolatile memory, spike‐timing‐based analog encoding, and hardware‐calibrated reservoir‐computing validation within a unified device ...
Yun‐Seo Shin +7 more
wiley +1 more source
Polarity‐matched Zr–MOFs program Nafion's nanoscale morphology during solution casting. Hydrophilic UiO‐66 preserves hydrated pathways, while hydrophobic UiO‐67 increases the proton hopping sites by densifying ionic clusters. Combining both fillers yields a membrane that delivers 176 mS cm−1 conductivity, reaches 1.46 W cm−2 under 200 kPa, and triples ...
Yonghwi Cho +13 more
wiley +1 more source
Controllability Analysis of Intercellular Protein-Protein Interaction Networks. [PDF]
Nozaki H +3 more
europepmc +1 more source
A gradient‐engineered all‐paper sensor is fabricated by integrating MXene and in situ grown AgNPs within hierarchical cellulose networks. The device breaks the sensitivity–detection range trade‐off through cascaded conductive pathways, enabling ultrahigh pressure sensitivity, humidity–pressure decoupled dual‐mode sensing, and outstanding EMI shielding,
Ao Li +7 more
wiley +1 more source
A visual perception-guided framework for camera path planning in large-scale digital twin and AI-generated 3D scenes. [PDF]
Zhang Y, Chen W, Yang G.
europepmc +1 more source

