Results 171 to 180 of about 15,954,263 (302)
Keratin recovered from animal‐hair textile waste is fractionated and blended with cellulose to produce continuously spun hybrid fibers. Selecting the high‐molecular‐weight keratin fraction enables 30 wt.% keratin incorporation while maintaining high strength in dry and wet states.
Mian Zhai +6 more
wiley +1 more source
Rapid microwave plasma torch engineering tunes crystal phases, carbon graphitization and oxygen‐vacancy defects in HfO2/C@C core‐shell fibrous membranes. Synergistic multi‐loss effects optimize impedance matching to deliver −65.75 dB reflection loss and a 7.37 GHz effective bandwidth for flexible electromagnetic wave absorption.
Qichao Ding +14 more
wiley +1 more source
Cardiac Self-Efficacy Mediates the Relationship Between Patient Empowerment and Medication Adherence: A Path Analysis in Patients With Coronary Artery Disease - Empirical Research Quantitative. [PDF]
Allahbakhshian A +5 more
europepmc +1 more source
Schematic illustration of LNP‐MPG nuclei‐targeting delivery of HMW‐FGF2 promoting histone acetylation to regulate the fate of DPSCs and treat spinal cord injury. LNPs components include pHMW‐FGF2 plasmid, DSPC, Dlin‐MC3‐DMA, cholesterol, and PEG2000, and are modified with MPG to form HMW‐FGF2@LNP‐MPG (HLM). HLM nuclei‐targets DPSCs to deliver HMW‐FGF2,
Heng Zhou +6 more
wiley +1 more source
Impact analysis of institutional framework and policy preferences with Bayesian structural equation. [PDF]
Jin S, Chang L, Zhang N, Li Y.
europepmc +1 more source
Architecture‐Driven Functional Coupling in Vertically Aligned Nanocomposites
Vertically aligned nanocomposites define a growth‐engineered architecture in which vertical interfaces, strain fields, defect pathways, and phase connectivity are created simultaneously. This review shows how these architectural features couple ferroic, optical, ionic, electrochemical, and device responses, establishing design rules and open challenges
Md Shatil Islam‐Shanto +4 more
wiley +1 more source
Hybrid path planning for mobile robots in complex environments: Fusing improved BI-RRT and enhanced DWA. [PDF]
Wang G, Sun H, Feng Z.
europepmc +1 more source
An Alhagi maurorum inspired hierarchical composite membrane (NFCu) was developed by integrating heavy metal remediation and solar‐driven interfacial evaporation in a single platform. Beyond the photothermal effect, a localized photocatalytic process is realized on the CuO surface, deepening the mechanistic understanding of light–matter–water ...
Yuqiong He +9 more
wiley +1 more source
Advanced quantum computing-driven digital twin for energy and timing optimization in low-power VLSI circuits &IoT devices. [PDF]
Mujahid MM, Jose D.
europepmc +1 more source
Top‐down ultrasonication produces highly emissive Cs2ZrCl6:Te4+ nanocrystals (NCs) with a PLQY of 65%, which is higher compared to that of the NCs synthesized by typical bottom‐up hot‐injection synthesis. The colloidal Cs2ZrCl6:Te4+ NCs have been found to be potential candidates for x‐ray scintillation imaging.
Yang Liu +12 more
wiley +1 more source

