Results 61 to 70 of about 15,954,263 (302)

Application of critical way to time constructing the shortest paths in the transport network in the conditions of interval uncertainty

open access: yesНаука. Инновации. Технологии, 2022
For the problem of routing on the transport network on the basis of the criti-cal path, we have developed algorithms for constructing the shortest time path for the sound and setting the duration of the interval operations.
Ramiz Aliyev Gasumov   +1 more
doaj  

Economic assessment of the mental health and wellbeing benefits of walking on the South West Coast Path: methodology and scoping study [PDF]

open access: yes, 2022
This is the author accepted manuscript. The final version is available from the South West Coast Path Association via the links in this record This report sets out the findings of research that aimed to assess the economic mental health and wellbeing ...
Petersen, C
core  

Global Rather Than Vertical‐Selective Saccadic Abnormalities in Progressive Supranuclear Palsy

open access: yesAnnals of Clinical and Translational Neurology, EarlyView.
ABSTRACT Objective To test whether vertical saccades are preferentially affected in Progressive Supranuclear Palsy (PSP). Methods PSP patients (n = 24) were compared to age‐matched controls (n = 94) and two degenerative groups (Alzheimer's disease, n = 20; Lewy body disease, n = 50).
Duy Duan Nguyen   +6 more
wiley   +1 more source

Glucagon‐Like Peptide‐1 Receptor Agonists in Multiple Sclerosis: A Topical Narrative Review

open access: yesAnnals of Clinical and Translational Neurology, EarlyView.
ABSTRACT The glucagon‐like peptide‐1 (GLP‐1) receptor agonists (RAs) are a relatively new class of drugs that were initially approved by the US Food and Drug Administration to improve glycemic control in patients with type 2 diabetes mellitus and, subsequently, weight reduction in patients with obesity.
Audrey Y. Chang, Farrah J. Mateen
wiley   +1 more source

Optimizing Resource-Constrained Scheduling in Materials Manufacturing Using an Improved Genetic Algorithm

open access: yesMaterials Proceedings
Efficient scheduling in materials manufacturing environment plays a crucial role in minimizing idle time, increasing throughput, and making better use of limited resources.
Kashifa Arif, Wasim Ahmad, Saif Ullah
doaj   +1 more source

RISK ASSESSMENT IN PROJECT PLANNING USING FMEA AND CRITICAL PATH METHOD [PDF]

open access: yesScientific Papers Series : Management, Economic Engineering in Agriculture and Rural Development, 2014
This paper is based upon the research undertaken for the development of the doctoral thesis “Management of software projects based on object-oriented technology”.
Sandra Milena CHOLES ARVILLA
doaj  

Critical Path Method & Project Evaluation and Review Technique: A Neutrosophic Review [PDF]

open access: yesNeutrosophic Sets and Systems
Fuzzy, intuitionistic, and neutrosophic sets are the primary focus of the review investigation under the extension concepts. The significance and use of triangular shape for data representation are investigated.
Navya Pratyusha M   +3 more
doaj   +1 more source

Critical Path Analysis and Project Management - Mini Lecture

open access: yes, 2011
A mini-lecture which introduces an overview of the Project Management lifecycle and demonstrates where Critical Path fits within Project Management.
EVOLUTION   +5 more
core  

Employment Trajectories of Patients With Systemic Lupus Erythematosus and Factors Driving Transitions Between States

open access: yesArthritis Care &Research, EarlyView.
Objective Systemic lupus erythematosus (SLE) significantly impacts employment capacity. This study aimed to investigate the impact of burden of disease activity, damage, and treatment on employment outcomes and transitions in patients with SLE. Methods Using data from a single center, we analyzed employment transitions, adjusted mean disease activity ...
Javier Mencia‐Ledo   +4 more
wiley   +1 more source

Analysis of Activity Planning In the 2765 Dwt Tanker Repair Process Using the Critical Path Method (Cpm) shipyard ; critical path method (cpm) ; project scheduling. [PDF]

open access: yes, 2022
Ships are basically a means of sea transportation, which connects an island or between regions of a country, which is used as passenger transportation, as well as transportation of goods.
Shahri, Ach Alfan
core   +2 more sources

Home - About - Disclaimer - Privacy