Results 331 to 340 of about 9,005,815 (383)
Some of the next articles are maybe not open access.
Quality of care and development of a critical pathway
Journal of Nursing Management, 2002The current study reports on the first step towards developing quality of care for stroke patients at a hospital in western Sweden. A general critical pathway from the patient's perspective was developed by a multidisciplinary group.The aim was to investigate quality of care and the effectiveness of a critical pathway.The study should be classified as ...
E Walldal, Carina Furåker, I Anund
openaire +3 more sources
Nursing Management (Springhouse), 1994
A multipurpose six-page, three-fold flow sheet improves patient outcomes, meets JCAHO standards and facilitates easy tracking of a patient's progress. The flow sheet is divided into nursing process, expected patient outcomes, critical pathway and variance report. Outcomes management is an effective process to control costs and improve patient outcomes.
openaire +3 more sources
A multipurpose six-page, three-fold flow sheet improves patient outcomes, meets JCAHO standards and facilitates easy tracking of a patient's progress. The flow sheet is divided into nursing process, expected patient outcomes, critical pathway and variance report. Outcomes management is an effective process to control costs and improve patient outcomes.
openaire +3 more sources
CRITICAL CARE PATHWAYS IN THROMBOEMBOLIC DISEASE
Orthopedics, 1995ABSTRACT Critical Care Pathways are outlines of each day's expected interventions and treatments for a particular process. They are part of a larger concept of case management, as an extramural, multidisciplinary approach to a patient's problems, with details suitable to their personality and case.
openaire +4 more sources
Assessment of Critical Exposure Pathways
2002Human exposure to phthalate esters for five different age classes is evaluated for the following routes of exposure: inhalation of air (indoors and outdoors), ingestion of drinking water,incidental ingestion of soil, ingestion of dust (indoors), and ingestion of food.
Donald Mackay+2 more
openaire +2 more sources
The Critical Pathways of an Anticoagulation Service
Critical Pathways in Cardiology: A Journal of Evidence-Based Medicine, 2003Robert C. Goldszer+2 more
openaire +3 more sources
Critical nodes in signalling pathways: insights into insulin action
Nature reviews. Molecular cell biology, 2006C. Taniguchi, B. Emanuelli, C. Kahn
semanticscholar +1 more source
Critical pathways in the emergency department.
Journal of emergency nursing, 1993The actual development of the CP is an easy undertaking that an experienced emergency nurse can accomplish. The important points to remember are as follows: (1) include all disciplines that provide patient care in the development of the CP, (2) use realistic time frames (i.e., those currently found to be true in the emergency department, not those that
openaire +3 more sources
Critical care management of chimeric antigen receptor T‐cell therapy recipients
Ca-A Cancer Journal for Clinicians, 2022Alexander Shimabukuro-vornhagen+2 more
exaly
Critical pathways in rehabilitation
The Case Manager, 1997Susan Martin-White+3 more
openaire +2 more sources