Results 101 to 110 of about 95,650 (334)
Timeslack-based techniques for generating robust projectschedules subject to resource uncertainty. [PDF]
The classical, deterministic resource-constrained project scheduling problem has been the subject of a great deal of research during the previous decades. This is not surprising given the high practical relevance of this scheduling problem. Nevertheless,
Demeulemeester, Erik +2 more
core
Enumeration and extension of non-equivalent deterministic update schedules in Boolean networks [PDF]
Eduardo C Palma +2 more
openalex +1 more source
ForeSight: A Predictive-Scheduling Deterministic Database
Deterministic databases enable scalable replicated systems by executing transactions in a predetermined order. However, existing designs fail to capture transaction dependencies, leading to insufficient scheduling, high abort rates, and poor resource utilization.
Huang, Junfang +4 more
openaire +2 more sources
Cross‐Scale Hierarchical Targeted Delivery System Based on Small‐Scale Magnetic Robots
This article reviews a cross‐scale hierarchical targeted delivery system that integrates magnetic continuum robots and magnetic microrobots. By combining rapid long‐range navigation with precise microscale targeting, the system overcomes key limitations of single‐scale approaches.
Junjian Zhou +4 more
wiley +1 more source
To support more advanced functionality in vehicles, there is the challenge of deterministic and reliable transmission of sensor data and control signals.
Binqi Li, Yuan Zhu, Qin Liu, Xiangxi Yao
doaj +1 more source
Simulation model for resource-constrained construction project
Repetition of the same processes on different objects or units of a construction project and their concurrent execution makes it necessary to use the same limited resources at the same time.
Biruk Sławomir, Rzepecki Łukasz
doaj +1 more source
Congestion costs in bottleneck equilibrium with stochastic capacity and demand [PDF]
I analyse congestion costs in the Vickrey bottleneck model of a congestible facility with a peak load in demand. The shape of the peak is endogenous, being the sum of individual scheduling decisions.
Fosgerau, Mogens
core +1 more source
Stochastic nanoscale physical cues induce glioblastoma (GBM)‐associated transcriptional traits in naïve astrocytes leading to spontaneous formation of spheroids. Cells within spheroids express activated‐MMP2 and a differential gene expression pattern involving P53 and NOTCH3, providing evidence for a role for changes in brain topography, as observed in
Laurent Starck +8 more
wiley +1 more source
Models for robust resource allocation in project scheduling. [PDF]
The vast majority of resource-constrained project scheduling efforts assumes complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed.
Herroelen, Willy, Leus, Roel
core
Bacterial α‐diversity decreases, but stochasticity and community stability increase across the 15 m‐depth vertical profiles and along the degraded gradient within the active layer. The abundance and interaction of core taxa mainly control community stability in the active and permafrost layers, respectively.
Shengyun Chen +13 more
wiley +1 more source

