Results 81 to 90 of about 568,091 (189)

Energy Conversion Alternatives Study (ECAS), Westinghouse phase 1. Volume 4: Open recuperated and bottomed gas turbine cycles [PDF]

open access: yes
Open-cycle recuperated gas turbine plant with inlet temperatures of 1255 to 1644 K (1800 to 2500 F) and recuperators with effectiveness values of 0, 70, 80 and 90% are considered.
Amos, D. J., Grube, J. E.
core   +1 more source

Redbridge College: report from the Inspectorate (FEFC inspection report; 122/97) [PDF]

open access: yes, 1997
The Further Education Funding Council has a legal duty to make sure further education in England is properly assessed. The FEFC’s inspectorate inspects and reports on each college of further education according to a four-year cycle. This is such a report

core  

Three phase power factor controller [PDF]

open access: yes, 1984
A power control circuit for a three phase induction motor is described. Power factors for the three phases are summed to provide a control signal, and this control signal is particularly filtered and then employed to control the duty cycle of each phase ...
Nola, F. J.
core   +1 more source

St Mary’s College, Blackburn: report from the Inspectorate (FEFC inspection report; 17/97 and 34/01) [PDF]

open access: yes, 2001
The Further Education Funding Council has a legal duty to make sure further education in England is properly assessed. The FEFC’s inspectorate inspects and reports on each college of further education according to a four-year cycle. This record comprises

core  

North Lincolnshire College: report from the Inspectorate (FEFC inspection report; 85/95 and 99/99) [PDF]

open access: yes, 1999
The Further Education Funding Council has a legal duty to make sure further education in England is properly assessed. The FEFC’s inspectorate inspects and reports on each college of further education according to a four-year cycle. This record comprises

core  

Peterborough Regional College: report from the Inspectorate (FEFC inspection report; 98/95 and 102/99) [PDF]

open access: yes, 1999
The Further Education Funding Council has a legal duty to make sure further education in England is properly assessed. The FEFC’s inspectorate inspects and reports on each college of further education according to a four-year cycle. This record comprises

core  

Lancaster and Morecambe College: report from the Inspectorate (FEFC inspection report; 74/94 and 57/99) [PDF]

open access: yes, 1999
The Further Education Funding Council has a legal duty to make sure further education in England is properly assessed. The FEFC’s inspectorate inspects and reports on each college of further education according to a four-year cycle. This record comprises

core  

Performance Analysis of a New Buck Converter for Small-Scale Green Hydrogen Generation

open access: yesIEEE Access
This paper proposes a large step-down buck converter suitable for small scale green hydrogen generation using alkaline water electrolysis. To overcome limitations of conventional buck converter the designed converter utilizes switched capacitor network ...
Shubham Priyadarshi   +3 more
doaj   +1 more source

FACT - Threshold prediction for higher duty cycle and improved scheduling

open access: yes, 2013
The First G-APD Cherenkov telescope (FACT) is the first telescope using silicon photon detectors (G-APD aka. SiPM). The use of Silicon devices promise a higher photon detection efficiency, more robustness and higher precision than photo-multiplier tubes.
Biland, A.   +24 more
core  

Home - About - Disclaimer - Privacy