VARIANCE ANALYSIS : EARNED VALUE MANAGEMENT (EVM)
SINERGI : Jurnal Riset Ilmiah, 2020Construction project management is a complex process that involves the integrated management of time, cost, and quality to achieve the desired results as planned. Effective supervision is needed so that the project can run according to the target without experiencing time or cost losses.
Kerlima Hutagaol +4 more
openaire +1 more source
Review of earned value management (EVM) methodology, its limitations, and applicable extensions
Journal of Management and Engineering Integration, 2019Department of Defense (DoD) Instruction 5000.02 requires an Earned Value Management System (EVMS) compliant with ANSI/EIA-748 for all DoD cost or incentive contracts valued at or greater than $20M. Earned Value Management (EVM) integrates cost, schedule, and time to draw conclusions about current project status as well as make projections for future ...
Nizam, Anisulrahman, Elshennawy, Ahmad
openaire +2 more sources
Integrated cost, quality, risk and schedule control through earned value management (EVM)
Journal of Engineering, Design and Technology, 2019PurposeThe purpose of this paper is to propose an integrated earned value management (EVM) approach to control quality, cost, schedule and risk of projects.Design/methodology/approachThis study represents a new EVM framework by considering a quality control index.
Tahereh Khesal +4 more
openaire +1 more source
Cost/Schedule Monitoring and Forecasting for Project Based on Earned Value Management (EVM)
Advanced Materials Research, 2014Earned value management (EVM) is one of the most widely used control tools in project management. It is a well-known management system that integrates cost, schedule and performance. Based on the traditional concept of EVM, the cost/schedule monitoring and forecasting model is proposed in this paper.
Jian Wen Huang +4 more
openaire +1 more source
10:00 Earned Value Management: EVM
2012The three separate ISO/DIS 21500:2011 processes of work control, schedule control and cost control are bound together into efficient earned value management. Setting work bench with phase dedicated accounts and tracing the financial expenditures will help to identify the real actual costs.
openaire +1 more source
ANALISIS PENGENDALIAN WAKTU DAN BIAYA DENGAN METODE EARNED VALUE MANAGEMENT (EVM)
Media Ilmiah Teknik SipilIt is often found that projects experience delays in completion during their implementation in the field. Project control is very necessary because it affects the success of a project. The aim of this research is to evaluate time and cost control in the Palembang Ministry of Health Polytechnic Academic Services Building Project using the Earned Value ...
Gery Heryanto +2 more
openaire +1 more source
Using Cost-Risk to Connect Cost Estimating and Earned Value Management (EVM)
2007 IEEE Aerospace Conference, 2007NASA space vehicle acquisition cost management has come under close scrutiny in the past three years due to perceived and actual cost overruns. As a result of two reports, the 2004 GAO report entitled, "Lack of Disciplined Cost-Estimating Processes Hinders NASA's Ability to Effectively Manage Its Programs" and the 2004 "President's Commission on ...
openaire +1 more source
EVALUASI PENGENDALIAN WAKTU DAN BIAYA DENGAN METODE EARNED VALUE MANAGEMENT (EVM)
Media Ilmiah Teknik SipilProblems in the Tarikolot Sidamulih Pangandaran Road Improvement Project delay in completing work so that time and cost trends not in accordance with the plan. It is necessary to evaluate the time and cost control on the Tarikolot Road Improvement Project Sidamulih Pangandaran using the Earned Value Management method (EVM).
Tri Guntoro, Yanti Defiana, Uu Saepudin
openaire +1 more source
Kostenbeheersing bij projectuitvoering : Earned Value Management (EVM) en wijzigingsproblematiek
Bedrijfskunde : Tijdschrift voor Modern Management, 2001In de projectmanagementliteratuur wordt de vergelijking van actuele kosten met begrote kosten belangrijk gevonden voor de beheersing van projecten, onder meer als basis voor de voorspelling van de totale kosten van het project. Earned Value Management (EVM) wordt zowel in de managementaccounting- als in de projectmanagementliteratuur gezien als een ...
Oomen, A.D., Veeken, van der, H.J.M.
openaire +1 more source