Cost/Schedule Monitoring and Forecasting for Project Based on Earned Value Management (EVM)

Advanced Materials Research, 2014
Earned value management (EVM) is one of the most widely used control tools in project management. It is a well-known management system that integrates cost, schedule and performance. Based on the traditional concept of EVM, the cost/schedule monitoring and forecasting model is proposed in this paper.
Jian Wen Huang   +4 more
exaly   +2 more sources

Integrated cost, quality, risk and schedule control through earned value management (EVM)

Journal of Engineering, Design and Technology, 2019
PurposeThe purpose of this paper is to propose an integrated earned value management (EVM) approach to control quality, cost, schedule and risk of projects.Design/methodology/approachThis study represents a new EVM framework by considering a quality control index.
Abbas Saghaei   +2 more
exaly   +2 more sources

Kostenbeheersing bij projectuitvoering : Earned Value Management (EVM) en wijzigingsproblematiek

open access: yesBedrijfskunde : Tijdschrift voor Modern Management, 2001
In de projectmanagementliteratuur wordt de vergelijking van actuele kosten met begrote kosten belangrijk gevonden voor de beheersing van projecten, onder meer als basis voor de voorspelling van de totale kosten van het project. Earned Value Management (EVM) wordt zowel in de managementaccounting- als in de projectmanagementliteratuur gezien als een ...
Oomen, A.D., Veeken, van der, H.J.M.
openaire   +2 more sources

VARIANCE ANALYSIS : EARNED VALUE MANAGEMENT (EVM)

SINERGI : Jurnal Riset Ilmiah, 2020
Construction project management is a complex process that involves the integrated management of time, cost, and quality to achieve the desired results as planned. Effective supervision is needed so that the project can run according to the target without experiencing time or cost losses.
Kerlima Hutagaol   +4 more
openaire   +1 more source

Earned value management under risk

open access: yesInternational Journal of Project Organisation and Management, 2011
This paper presents a newly developed project monitoring and controlling method based on the synergy between project risk management (PRM) and earned value management (EVM).
Konstantinos Kirytopoulos
exaly   +2 more sources

The role of advanced earned value management (EVM) metrics in schedule performance analysis of building projects

World Journal of Advanced Engineering Technology and Sciences, 2023
Although venerable by the tide, the tools and metrics used still include CPI, SPI, and performance in the form of schedules; these hardly reflect true scheduling performance, especially in more complex scenarios of building projects subject to multiple variables.
openaire   +1 more source

10:00 Earned Value Management: EVM

2012
The three separate ISO/DIS 21500:2011 processes of work control, schedule control and cost control are bound together into efficient earned value management. Setting work bench with phase dedicated accounts and tracing the financial expenditures will help to identify the real actual costs.
openaire   +1 more source

Using Cost-Risk to Connect Cost Estimating and Earned Value Management (EVM)

2007 IEEE Aerospace Conference, 2007
NASA space vehicle acquisition cost management has come under close scrutiny in the past three years due to perceived and actual cost overruns. As a result of two reports, the 2004 GAO report entitled, "Lack of Disciplined Cost-Estimating Processes Hinders NASA's Ability to Effectively Manage Its Programs" and the 2004 "President's Commission on ...
openaire   +1 more source

The Relationship Between Sustainability and Project Performance Based on Earned Value Management (EVM)

Proceedings of the 12th IPMA Research Conference “Project Management in the Age of Artificial Intelligence”
The proliferation of scientific literature presents researchers and clinicians with substantial problems, particularly in terms of being current with the fundamental literature in their respective domains. There is a need for efficient tools that can analyse and visualize trends and patterns in scientific literature as the number and complexity of ...
Hossein Radmehr, Graça Miranda Silva
openaire   +1 more source

ANALISIS PENGENDALIAN WAKTU DAN BIAYA DENGAN METODE EARNED VALUE MANAGEMENT (EVM)

Media Ilmiah Teknik Sipil
It is often found that projects experience delays in completion during their implementation in the field. Project control is very necessary because it affects the success of a project. The aim of this research is to evaluate time and cost control in the Palembang Ministry of Health Polytechnic Academic Services Building Project using the Earned Value ...
Gery Heryanto   +2 more
openaire   +1 more source