Analisis Kinerja Proyek Conveyor PT UES Menggunakan Earned Value Management (EVM) Berbasis Python

open access: yesJurnal Teknik Ilmu dan Aplikasi
PT UES merupakan perusahaan yang bergerak di bidang konstruksi dengan pengalaman lebih dari 50 tahun dalam menangani berbagai proyek, termasuk pembangunan sistem conveyor. Dalam pelaksanaan proyek konstruksi, pengendalian biaya dan waktu merupakan aspek penting yang menentukan keberhasilan proyek.
Muhamad Haikal
openaire   +2 more sources

Earned value management under risk

open access: yesInternational Journal of Project Organisation and Management, 2011
This paper presents a newly developed project monitoring and controlling method based on the synergy between project risk management (PRM) and earned value management (EVM).
Konstantinos A. Kirytopoulos
exaly   +2 more sources

The role of advanced earned value management (EVM) metrics in schedule performance analysis of building projects

World Journal of Advanced Engineering Technology and Sciences, 2023
Although venerable by the tide, the tools and metrics used still include CPI, SPI, and performance in the form of schedules; these hardly reflect true scheduling performance, especially in more complex scenarios of building projects subject to multiple variables.
openaire   +1 more source

10:00 Earned Value Management: EVM

2012
The three separate ISO/DIS 21500:2011 processes of work control, schedule control and cost control are bound together into efficient earned value management. Setting work bench with phase dedicated accounts and tracing the financial expenditures will help to identify the real actual costs.
openaire   +1 more source

The Relationship Between Sustainability and Project Performance Based on Earned Value Management (EVM)

Proceedings of the 12th IPMA Research Conference “Project Management in the Age of Artificial Intelligence”
The proliferation of scientific literature presents researchers and clinicians with substantial problems, particularly in terms of being current with the fundamental literature in their respective domains. There is a need for efficient tools that can analyse and visualize trends and patterns in scientific literature as the number and complexity of ...
Hossein Radmehr, Graça Miranda Silva
openaire   +1 more source

Using Cost-Risk to Connect Cost Estimating and Earned Value Management (EVM)

2007 IEEE Aerospace Conference, 2007
NASA space vehicle acquisition cost management has come under close scrutiny in the past three years due to perceived and actual cost overruns. As a result of two reports, the 2004 GAO report entitled, "Lack of Disciplined Cost-Estimating Processes Hinders NASA's Ability to Effectively Manage Its Programs" and the 2004 "President's Commission on ...
openaire   +1 more source

ANALISIS PENGENDALIAN WAKTU DAN BIAYA DENGAN METODE EARNED VALUE MANAGEMENT (EVM)

Media Ilmiah Teknik Sipil
It is often found that projects experience delays in completion during their implementation in the field. Project control is very necessary because it affects the success of a project. The aim of this research is to evaluate time and cost control in the Palembang Ministry of Health Polytechnic Academic Services Building Project using the Earned Value ...
Gery Heryanto   +2 more
openaire   +1 more source

EVALUASI PENGENDALIAN WAKTU DAN BIAYA DENGAN METODE EARNED VALUE MANAGEMENT (EVM)

Media Ilmiah Teknik Sipil
Problems in the Tarikolot Sidamulih Pangandaran Road Improvement Project delay in completing work so that time and cost trends not in accordance with the plan. It is necessary to evaluate the time and cost control on the Tarikolot Road Improvement Project Sidamulih Pangandaran using the Earned Value Management method (EVM).
Tri Guntoro, Yanti Defiana, Uu Saepudin
openaire   +1 more source

Earned Value Management System (EVMS) Reliability: A Review of Existing EVMS Literature

Construction Research Congress 2020, 2020
Namho Cho   +3 more
openaire   +1 more source

Adapting Earned Value Management (EVM) to Investment Project Management in Russian Real Estate Development

JOURNAL OF MONETARY ECONOMICS AND MANAGEMENT
The article addresses the challenges of managing the cost and schedule of investment projects in Russian real estate development under conditions of high macroeconomic uncertainty. The necessity of implementing the integrated Earned Value Management (EVM) methodology, which combines cost, schedule and work volume control, is substantiated.
openaire   +1 more source