Application of Earned Value Analysis Method and Earned Schedule Method to Time and Cost Control In Bank X Building Project

open access: yesJurnal Syntax Transformation
Construction projects are activities that must be completed within limited time and resources. This research aims to identify risky activities and make control efforts to reduce the level of hazard risk in the installation of steel box girder on the bridge.
Dina Afrila   +3 more
openaire   +2 more sources

Deploying Value Engineering Strategies for Ameliorating Construction Project Management Performance: A Delphi-SWARA Study Approach

open access: yesBuildings
This study was carried out to rank and prioritize the aspects that have been shown to have an impact on the improvement of construction project management (CPM) performance based on value engineering.
Esmaeil Nejatyan   +3 more
doaj   +1 more source

Cost and Time Analysis Using the Earned Value Analysis Method

open access: yesEduvest - Journal of Universal Studies
Construction project management prioritizes the achievement of three main objectives: cost, quality, and time. This study evaluates a road widening project in Mojokerto Regency with a target completion time of 150 days. To prevent delays and cost overruns, researchers used the Earned Value method to identify early warnings regarding project performance.
Sugeng Hariyadi   +2 more
openaire   +1 more source

Behaviorally Adaptive and Inclusive Advanced Driver‐Assistance Systems

open access: yesAdvanced Intelligent Systems, EarlyView.
Advanced driver‐assistance systems (ADASs) are mapped as evolving human‐centered, adaptive technologies linking sensing, driver monitoring, AR/HUD interfaces, patents, regulation, and inclusive design. The review identifies gaps in real‐world evidence, diverse‐driver validation, gaze metrics, and governance, outlining a roadmap for safer, behaviorally ...
Jana Skirnewskaja   +2 more
wiley   +1 more source

How cold is too cold? A theoretical analysis of the optimal trigger for index insurance for frost damage to crops

open access: yesAmerican Journal of Agricultural Economics, EarlyView.
Abstract Crop insurance is undoubtedly an extremely valuable element in protecting agricultural businesses, but in many cases standard indemnity‐based products have had very low uptake due to high transaction costs elevating premiums to unaffordable levels.
Amogh Prakasha Kumar   +2 more
wiley   +1 more source

The Interaction of Metropolitan Cost-of-living & the Federal Earned Income Tax Credit: One Size Fits All? [PDF]

open access: yes
This paper explores the interaction between the federal Earned Income Tax Credit (EITC) and the cost-of-living faced by single mothers. After the 1993 EITC expansion, we identify up to a 10 percentage point increase in labor force participation for ...
Katie Fitzpatrick, Jeffrey Thompson
core  

How does the Kids SIPsmartER program impact the sugar‐sweetened beverage intake of students: An investigation beyond total treatment effect in randomized controlled trial

open access: yesAmerican Journal of Agricultural Economics, EarlyView.
Abstract This study develops and empirically estimates a structural framework to decompose the causal pathways of multilevel behavioral interventions targeting adolescent health behaviors. We apply this framework to the Kids SIPsmartER (KSS) program, a 6‐month, school‐based intervention evaluated through a clustered randomized controlled trial in rural
Naveen Abedin   +5 more
wiley   +1 more source

The Earned Income Tax Credit and Rural Families: Differences between Participants and Non-participants [PDF]

open access: yes
The differences between rural low-income mothers who were participants and non-participants in the Earned Income Tax Credit (EITC) were examined. One-third of the 224 eligible mothers in a multi-state study did not claim the tax credit.
Frances C. Lawrence   +4 more
core  

Earned value forecast accuracy and activity criticality

open access: yes, 2008
This paper presents new simulation results on the forecast accuracy of earned value based metrics to predict a project’s final duration. This is the sec ond paper in a series of papers based on the simulation study initially proposed by Vanhoucke and ...
Vanhoucke, Mario, Vandevoorde, Stephan
core   +1 more source