Results 241 to 250 of about 7,003 (282)

Rethinking the sphenoparietal sinus: implications for lesser sphenoid wing dural arteriovenous fistulas. Illustrative cases. [PDF]

open access: yesJ Neurosurg Case Lessons
Serioli S   +7 more
europepmc   +1 more source

Early Autonomic Dysfunction Following Severe TBI and Impact on Cerebral Hemodynamics: A Narrative Review. [PDF]

open access: yesJ Clin Med
Monten K   +6 more
europepmc   +1 more source

Hemispherotomy for Drug-Resistant Epilepsy in a Low-Resource Setting: Surgical Outcomes and Quality of Life in 23 Children Treated in a Hybrid Program in Panama.

open access: yesPediatr Neurosurg
Rhodenhiser EG   +12 more
europepmc   +1 more source

WSOG and Emergency Disconnection Guidelines [PDF]

open access: yesOTC Brasil, 2017
Abstract Dynamic Positioning (DP) systems are becoming more and more used in the Oil and Gas Industry. Over the last decades, the escalation in deep-water exploration and development resulted in an increased number of dynamic positioned rigs.
Daniel Ferreira Cruz   +1 more
openaire   +2 more sources

Emergency Disconnection Guidelines [PDF]

open access: yesOTC Brasil, 2013
Abstract The construction of petroleum wells is becoming more and more complex and challenger. Drilling and completion in deep and ultra deep water requires use of dynamic positioning rigs increasingly sophisticated. Despite all the technology, an emergency disconnection may occurs at any time in dynamic positioning
Diogo Fonseca   +1 more
openaire   +2 more sources
Some of the next articles are maybe not open access.

Related searches:

Study on mud discharge after emergency disconnection of deepwater drilling risers

Journal of Petroleum Science and Engineering, 2020
Abstract Mud is often discharged into seawater after emergency disconnection of risers in offshore oil and gas drilling engineering. The discharged mud needs to be simulated accurately since it can produce a huge load on risers. Several mud discharge models have been proposed, such as Young's slug model, SFM model, WFC model and one-dimensional ...
Yuanjiang Chang
exaly   +2 more sources

Improved recoil dynamic analysis of the deepwater riser system after emergency disconnection

Applied Ocean Research, 2021
Abstract The riser recoil after emergency disconnection is a complicated multi-coupling process. However, most existing analytical models simplify the tensioner as a constant stiffness spring, divide the riser system into different finite element segments, and do not consider the coupling effect between the riser movement and the fluid discharge.
Yuanjiang Chang   +2 more
exaly   +2 more sources

Home - About - Disclaimer - Privacy