Results 171 to 180 of about 30,895 (213)
Some of the next articles are maybe not open access.

Minimum-EVM N-continuous OFDM

2016 IEEE International Conference on Communications (ICC), 2016
The N-continuous precoder for the suppression of OOB emission in OFDM systems that minimizes the EVM is introduced. We show that the minimum in-band interference due to the introduced precoding approach is 3 dB less than the inband interference of existing N-continuous precoders.
Medhat Mohamad   +2 more
openaire   +1 more source

VNC server based EVM system

2017 International Conference on Energy, Communication, Data Analytics and Soft Computing (ICECDS), 2017
Earlier EVMs is used to record number of votes where ballot papers of boxes were used in conventional method of voting system. In this paper the VNC server based Ras pberry Pi 3 Electronic voting machine is designed and implimented. The Raspberry Pi 3 VNC server based EVM system has high security with passwor d by using a aadhar id and finger print ...
N.N. Nagamma   +4 more
openaire   +1 more source

The EVM Fundamentals

2009
Earned Value Management (EVM) is a methodology used since the 1960s, when the USA department of defense proposed a standard method to measure a project’s performance. The system relies on a set of often straightforward metrics to measure and evaluate the general health of a project.
openaire   +1 more source

EVM measurement techniques for MUOS

MILCOM 2009 - 2009 IEEE Military Communications Conference, 2009
Physical layer simulations and analysis techniques were used to develop the Error Vector Magnitude (EVM) metric specifying transmitter signal quality. These tools also proved to be very useful in specifying lower level hardware unit performance and predicting Mobile User Objective System (MUOS) satellite 8-PSK transmitter performance before the ...
A. K. Wang, Andrew M. McAllister
openaire   +1 more source

VARIANCE ANALYSIS : EARNED VALUE MANAGEMENT (EVM)

SINERGI : Jurnal Riset Ilmiah, 2020
Construction project management is a complex process that involves the integrated management of time, cost, and quality to achieve the desired results as planned. Effective supervision is needed so that the project can run according to the target without experiencing time or cost losses.
Kerlima Hutagaol   +4 more
openaire   +1 more source

Beyond the EVM Fundamentals

2009
Despite the ever growing positive attention to EVM, the use of earned value metrics has been questioned by various authors when it is applied to highly complex and/or innovative projects. Indeed, EVM rests on a fundamental assumption that project activities and precedence relations are known in advance, and hence, assumes a project setting where ...
openaire   +1 more source

Оценка эффективности EVM-модели

Promyshlennoe i Grazhdanskoe Stroitel'stvo
В статье рассматривается EVM-модель и оценивается ее эффективность. В качестве синонима EVM-модели авторы применят термин "траектория освоения капитальных вложений". Для описания траектории (процедуры) финансирования проекта создания объекта капитального строительства предлагается использовать хорошо известную модель поступательного движения ...
openaire   +1 more source

Transition EVM - LEO

Mémoire professionnel, Diplôme d'enseignement pour le degré secondaire ...
openaire   +1 more source

EVM: Speeding Up the EM Algorithm

SSRN Electronic Journal, 2020
This article shows how the EM algorithm can be sped up by computing the gradient and Hessian of the observed log-likelihood and then using a Newton algorithm. The gradient and Hessian are computed using two identities associated with the expected log-likelihood. Illustrative examples are provided for co-variance estimation with missing observations and
openaire   +1 more source

Integrate Risk Management with EVM

2011
This chapter contains sections titled: Introduction Guideline 3.1 Guideline 3.2 Summary ...
openaire   +1 more source

Home - About - Disclaimer - Privacy