Results 141 to 150 of about 197,282 (196)

Energy-efficient flexible flow shop scheduling with worker flexibility

Expert Systems With Applications, 2020
Abstract The classical flexible flow shop scheduling problem (FFSP) only considers machine flexibility. Thus far, the relevant literature has not studied FFSPs with worker flexibility, which is widely seen in practical manufacturing systems. Worker flexibility may greatly affect production efficiency and productivity.
Guiliang Gong   +2 more
exaly   +2 more sources

Scheduling jobs on a k-stage flexible flow-shop

open access: yesAnnals of Operations Research, 2007
zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Carlos D Paternina-Arboleda   +1 more
exaly   +5 more sources

Flexible flow shop scheduling with uniform parallel machines

European Journal of Operational Research, 2006
zbMATH Open Web Interface contents unavailable due to conflicting licenses.
George J Kyparisis, Christos Koulamas
exaly   +2 more sources

Deadlock avoidance in flexible flow shops with loops

Journal of Intelligent Manufacturing, 2003
This paper presents a deadlock-avoidance scheme that was developed during the MASCADA Project—Esprit LTR Project 22728. The deadlock problem occurs in a car body painting shop. From this application, an abstract problem was derived for which a deadlock-avoidance method was developed.
Paul Valckenaers, Hendrik Van Brussel
openaire   +1 more source

Home - About - Disclaimer - Privacy