Results 131 to 140 of about 4,448,508 (254)

Decision-based genetic algorithms for solving multi-period project scheduling with dynamically experienced workforce [PDF]

open access: yes, 2012
The importance of the flexibility of resources increased rapidly with the turbulent changes in the industrial context, to meet the customers’ requirements.
Le Lann, Jean-Marc   +2 more
core  

Emerging Post‐CMOS Hardware Neurons for Brain‐Inspired Computing: Devices, Circuits, and System Integration

open access: yesAdvanced Functional Materials, EarlyView.
The physical realization of artificial neurons is a critical challenge for energy‐efficient neuromorphic computing. This review presents a comprehensive analysis of the evolution of artificial neuron implementations from conventional CMOS to emerging post‐CMOS technologies.
Kannan Udaya Mohanan   +4 more
wiley   +1 more source

Multiple rules with game theoretic analysis for flexible flow shop scheduling problem with component altering times

open access: yes, 2016
This paper studies the flexible flow shop scheduling problem with component altering times (FFSP-CAT), which is a specific form of the flexible flow shop scheduling problem with sequence dependent setup times in the practical scenario.
Chen, Zhili   +3 more
core  

Bio‐Inspired Artificial Ionic Mechanoreceptor

open access: yesAdvanced Functional Materials, EarlyView.
A skin‐inspired artificial mechanoreceptor based on ionic interactions is presented for biomimetic tactile sensing. Pressure‐driven ionic redistribution within microfluidic channels generates a self‐powered electrical signal without external bias. The generated waveform exhibits mechanoreceptor‐like temporal features, including overshoot and undershoot,
Mohammad Akbari   +4 more
wiley   +1 more source

Sequencing CONWIP flow-shops: Analysis and heuristics [PDF]

open access: yes
In this paper, we address the backlog sequencing problem in a flow-shop controlled by a CON\VIP production control system with the objective to minimise the make span We characterise the problem and analyse its similarities and differences with the ...
Framiúnan, Jose M.   +2 more
core  

Hybrid PSO/DE solution for the earliness/tardiness case of hybrid flow-shop scheduling problem

open access: yes, 2012
In this paper, a hybrid method based on particle swarm optimization (PSO) and differential evolution (DE) algorithm is presented to solve the earliness tardiness (E/T) hybrid flow-shop scheduling problem (HFSP). PSO/DE is used to take global optimization.
Han ZH(韩忠华)   +3 more
core   +1 more source

Tracking Battery Microstructural Degradation Through Directional Thermal Transport Signatures

open access: yesAdvanced Functional Materials, EarlyView.
In lithium‐ion batteries, heat conduction varies between the through‐plane and in‐plane directions because of the cell's layered structure. Therefore, cell degradation influences thermal conductivity in each direction uniquely due to detailed microstructural and compositional changes.
Mohammad Shoghi Tekmedash   +6 more
wiley   +1 more source

SIMAID: a rapid development methodology for the design of acyclic, bufferless, multi-process and mixed model agile production facilities for spaceframe vehicles [PDF]

open access: yes
The facility layout problem (FL) is a non-linear, NP-complete problem whose complexity is derived from the vast solution space generated by multiple variables and interdependent factors.
Tebaldi, Enrico
core  

Programmable Soft Actuator with Multi‐Responsiveness Based on Conductive MOF‐Liquid Crystal Polymer Composite

open access: yesAdvanced Functional Materials, EarlyView.
A sequential dual‐alignment strategy independently programs the orientation of conductive metal‐organic framework (c‐MOF) microrods and liquid crystals within a composite film. This approach creates an asymmetric bilayer structure that enables precise, multi‐responsive actuation.
Taegyun Hong   +5 more
wiley   +1 more source

Earliness/tardiness flow-shop scheduling under uncertainty

open access: yes, 2005
For unconventional scheduling problems, both job sequence and starting time of every operation must be optimized, which increases the difficulties of solving this kind of problem.
Zhu YL(朱云龙)   +2 more
core  

Home - About - Disclaimer - Privacy