Modelli e algoritmi di routing non lineare per l'integrazione planning-scheduling in produzione [PDF]
Questo lavoro di tesi propone un algoritmo ACO (Ant Colony Optimization) per risolvere il problema di integrazione del ciclo di lavorazione (produzione) con lo scheduling dell’impianto produttivo (Multimode Flexible Job Shop Problem).
BRONTE, ALESSANDRO
core
Exploration of the green flexible job-shop scheduling problem is essential for enterprises aiming for sustainable practices, including energy conservation, emissions reduction, and enhanced economic and social benefits.
Shun Jia +8 more
semanticscholar +1 more source
With the rapid development of economic globalization and green manufacturing, traditional flexible job shop scheduling has evolved into the low-carbon heterogeneous distributed flexible job shop scheduling problem (LHDFJSP).
Yi Chen +3 more
doaj +1 more source
With the continuous advancement of manufacturing, job shop scheduling faces complex dynamic disturbances that pose significant challenges to production.
Lan Yang +3 more
doaj +1 more source
Efficiency of the solution representations for the hybrid flow shop scheduling problem with makespan objective [PDF]
In this paper we address the classical hybrid flow shop scheduling problem with makespan objective. As this problem is known to be NP-hard and a very common layout in real-life manufacturing scenarios, many studies have been proposed in the literature to
Fernández-Viagas Escudero, Víctor +2 more
core
Computing Idle Times in Fuzzy Flexible Job Shop Scheduling
The flexible job shop scheduling problem is relevant in many different areas. However, the usual deterministic approach sees its usefulness limited, as uncertainty plays a paramount role in real-world processes. Considering processing times in the form of fuzzy numbers is a computationally affordable way to model uncertainty that enhances the ...
Pablo García Gómez +2 more
openaire +3 more sources
An efficient memetic algorithm for the flexible job shop with setup times [PDF]
This paper addresses the flexible job shop scheduling problem with sequence-dependent setup times (SDSTFJSP). This is an extension of the classical job shop scheduling problem with many applications in real production environments.
González Fernández, Miguel Ángel +2 more
core
Flexible job shop scheduling has received considerable attention due to its extensive applications in manufacturing. High-quality scheduling solutions are desired but hard to be guaranteed due to the NP-hardness of computational complexity. In this work,
Dan Li +3 more
doaj
Hybrid cooperative coevolution for fuzzy flexible job shop scheduling problems [PDF]
In this paper we consider a variant of the flexible job shop scheduling problem with uncertain task durations modelled as fuzzy numbers. We propose a cooperative coevolutionary algorithm to minimise the schedule’s makespan, with two different populations
González Rodríguez, Inés +3 more
core
An Improved African Vulture Optimization Algorithm for Dual-Resource Constrained Multi-Objective Flexible Job Shop Scheduling Problems. [PDF]
He Z, Tang B, Luan F.
europepmc +1 more source