Results 21 to 30 of about 22,784 (309)
A Green Flexible Job-Shop Scheduling Model for Multiple AGVs Considering Carbon Footprint
Green and low carbon automated production has become a research hotspot. In this paper, the AGV transport resource constraint, machine layout and job setup time have been integrated into the background of a flexible job shop.
Xinxin Zhou +3 more
doaj +1 more source
Reasonable scheduling of flexible job shop is key to improve production efficiency and economic benefits; in order to solve the problem in flexible job shop scheduling problem, a novel flexible job shop scheduling method based on improved artificial ...
Rui Zeng, Yingyan Wang
doaj +1 more source
Flexible Job Shop Scheduling Problems with Arbitrary Precedence Graphs [PDF]
A common assumption in the shop scheduling literature is that the processing order of the operations of each job is sequential; however, in practice, there can be multiple connections and finish‐to‐start dependencies among the operations of each job. This paper studies flexible job shop scheduling problems with arbitrary precedence graphs.
Kasapidis, G. A. +3 more
openaire +2 more sources
Review on flexible job shop scheduling
Flexible job shop scheduling problem (FJSP) is an NP‐hard combinatorial optimisation problem, which has significant applications in the real world. Due to its complexity and significance, lots of attentions have been paid to tackle this problem. In this study, the existing solution methods for the FJSP in recent literature are classified into exact ...
Jin Xie +4 more
openaire +1 more source
An Improved Shuffled Frog-Leaping Algorithm for Flexible Job Shop Scheduling Problem
The flexible job shop scheduling problem is a well-known combinatorial optimization problem. This paper proposes an improved shuffled frog-leaping algorithm to solve the flexible job shop scheduling problem. The algorithm possesses an adjustment sequence
Kong Lu +5 more
doaj +1 more source
With the development of intelligent manufacturing and the customized product demand of customers, manufacturing enterprises are urgently required to carry out high-efficiency, high-quality, flexibility and low-cost manufacturing to enhance the ...
Yanwei Sang, Jianping Tan, Wen Liu
doaj +1 more source
Research on Flexible Job Shop Scheduling Problem
Abstract The adjustment time and processing time of the job on the machine are studied as an independent factor considering the influence of the adjustment time, such as installation and positioning, on the efficiency of production scheduling.
Xiangnan Li, Xu Liang
openaire +1 more source
A FJSSP Method Based on Dynamic Multi-Objective Squirrel Search Algorithm
This paper comprehensively analyzes the characteristics of flexible job shop scheduling problem (FJSSP), takes the dynamic factors in the actual scheduling process such as the arrival and departure of jobs, the breakdown and recovery of machines into ...
Yanjiao Wang, Jieru Han
doaj +1 more source
Multiobjective optimization for complex flexible job-shop scheduling problems
zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Tamssaouet, Karim +4 more
openaire +3 more sources
An effective hybrid algorithm for multi-objective flexible job-shop scheduling problem
Genetic algorithm is one of primary algorithms extensively used to address the multi-objective flexible job-shop scheduling problem. However, genetic algorithm converges at a relatively slow speed.
Xiabao Huang, Zailin Guan, Lixi Yang
doaj +1 more source

