Flexible job shop scheduling problem in manufacturing [PDF]
This paper addresses a real assembly cell: the AIP-PRIMECA cell at the Université de Valenciennes et du Hainaut-Cambrésis, in France. This system can be viewed as a Flexible Job Shop, leading to the formulation of a Flexible Job Shop Scheduling Problem (
Barbosa, José +3 more
core +2 more sources
Sensibility study in a flexible job shop scheduling problem [PDF]
This paper proposes the impact assessment of the jobs order in the optimal time of operations in a Flexible Job Shop Scheduling Problem. In this work a real assembly cell was studied: the AIP-PRIMECA cell at the Université de Valenciennes et du Hainaut-
Barbosa, José +3 more
core +8 more sources
The flexible job shop scheduling problem: A review
zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Dauzère-Pérès, Stéphane +3 more
openaire +6 more sources
Improved Jaya Algorithm for Flexible Job Shop Rescheduling Problem [PDF]
Machine recovery is met from time to time in real-life production. Rescheduling is often a necessary procedure to cope with it. Its instability gauges the number of changes to the existing scheduling solutions.
Kaizhou Gao +4 more
doaj +2 more sources
Flexible Job Shop Scheduling Problems with Arbitrary Precedence Graphs [PDF]
A common assumption in the shop scheduling literature is that the processing order of the operations of each job is sequential; however, in practice, there can be multiple connections and finish‐to‐start dependencies among the operations of each job. This paper studies flexible job shop scheduling problems with arbitrary precedence graphs.
Kasapidis, G. A. +3 more
openaire +2 more sources
Multiobjective optimization for complex flexible job-shop scheduling problems
zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Tamssaouet, Karim +4 more
openaire +3 more sources
Research on Flexible Job Shop Scheduling Problem
Abstract The adjustment time and processing time of the job on the machine are studied as an independent factor considering the influence of the adjustment time, such as installation and positioning, on the efficiency of production scheduling.
Xiangnan Li, Xu Liang
openaire +1 more source
Reasonable scheduling of flexible job shop is key to improve production efficiency and economic benefits; in order to solve the problem in flexible job shop scheduling problem, a novel flexible job shop scheduling method based on improved artificial ...
Rui Zeng, Yingyan Wang
doaj +1 more source
With the development of intelligent manufacturing and the customized product demand of customers, manufacturing enterprises are urgently required to carry out high-efficiency, high-quality, flexibility and low-cost manufacturing to enhance the ...
Yanwei Sang, Jianping Tan, Wen Liu
doaj +1 more source
Dynamic flexible job shop scheduling method based on improved gene expression programming
Dynamic scheduling is one of the most important key technologies in production and flexible job shop is widespread. Therefore, this paper considers a dynamic flexible job shop scheduling problem considering setup time and random job arrival.
Chunjiang Zhang +5 more
doaj +1 more source