Results 241 to 250 of about 226,189 (297)

The Third‐Generation Magnetic Super‐Stable Mineralizer: Complete Removal and Separation of Multiple Heavy Metal Pollutants

open access: yesAdvanced Science, EarlyView.
The 3rd‐generation magnetic super‐stable mineralizer M‐MgAl‐700 features a core‐shell structure, strong superparamagnetism, large surface area, and abundant oxygen defects. It achieves exceptional Cd(II) and As(V) mineralization capacities, reducing both pollutants in co‐contaminated water and soil to meet national standards.
Haoran Wang   +9 more
wiley   +1 more source

Flexible Job Shop Scheduling Problems Dealing with Expiration Issues

open access: yesInternational Journal for Research in Applied Science and Engineering Technology, 2018
openaire   +1 more source

Organoid Brain‐Machine‐Interface Devices for Central Nervous System Repair

open access: yesAdvanced Science, EarlyView.
We envision organoid brain‐machine‐interface (Organoid‐BMI) devices as new biohybrid bidirectional communication pathways to connect the human CNS and the external world for personalized CNS repair and regeneration. ABSTRACT Central nervous system (CNS) repair and regeneration suffer from tremendous clinical challenges due to current limitations in ...
Yantao Xing   +10 more
wiley   +1 more source

Two hybrid flow shop scheduling lines with assembly stage and compatibility constraints. [PDF]

open access: yesPLoS One
Muñoz-Sánchez R   +3 more
europepmc   +1 more source

A genetic algorithm for the Flexible Job-shop Scheduling Problem

Computers & Operations Research, 2008
In this paper a genetic algorithm for the flexible job-shop scheduling problem is presented. Given are a set of machines and a set of jobs consisting of operations which have to be sequenced in a fixed order. Each operation can be processed by a subset of the machines and its processing time depends on the assigned machine.
Pezzella, F.   +2 more
openaire   +4 more sources

Home - About - Disclaimer - Privacy