Results 21 to 30 of about 7,585,843 (289)

Research on Many-Objective Flexible Job Shop Intelligent Scheduling Problem Based on Improved NSGA-III

open access: yesIEEE Access, 2020
With the development of intelligent manufacturing and the customized product demand of customers, manufacturing enterprises are urgently required to carry out high-efficiency, high-quality, flexibility and low-cost manufacturing to enhance the ...
Yanwei Sang, Jianping Tan, Wen Liu
doaj   +1 more source

A linear programming-based method for job shop scheduling [PDF]

open access: yes, 2012
We present a decomposition heuristic for a large class of job shop scheduling problems. This heuristic utilizes information from the linear programming formulation of the associated optimal timing problem to solve subproblems, can be used for any ...
Bülbül, Kerem, Kaminsky, Philip
core   +1 more source

An improved constraint satisfaction adaptive neural network for job-shop scheduling [PDF]

open access: yes, 2010
Copyright @ Springer Science + Business Media, LLC 2009This paper presents an improved constraint satisfaction adaptive neural network for job-shop scheduling problems.
Yang, S   +11 more
core   +1 more source

An Improved Shuffled Frog-Leaping Algorithm for Flexible Job Shop Scheduling Problem

open access: yesAlgorithms, 2015
The flexible job shop scheduling problem is a well-known combinatorial optimization problem. This paper proposes an improved shuffled frog-leaping algorithm to solve the flexible job shop scheduling problem. The algorithm possesses an adjustment sequence
Kong Lu   +5 more
doaj   +1 more source

Two-Stage Learning For the Flexible Job Shop Scheduling Problem

open access: yesCoRR, 2023
The Flexible Job-shop Scheduling Problem (FJSP) is an important combinatorial optimization problem that arises in manufacturing and service settings. FJSP is composed of two subproblems, an assignment problem that assigns tasks to machines, and a scheduling problem that determines the starting times of tasks on their chosen machines.
Wenbo Chen 0001   +2 more
openaire   +2 more sources

Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling [PDF]

open access: yes, 2000
Copyright @ 2000 IEEEThis paper presents a constraint satisfaction adaptive neural network, together with several heuristics, to solve the generalized job-shop scheduling problem, one of NP-complete constraint satisfaction problems.
Yang, S   +3 more
core   +1 more source

A Green Flexible Job-Shop Scheduling Model for Multiple AGVs Considering Carbon Footprint

open access: yesSystems, 2023
Green and low carbon automated production has become a research hotspot. In this paper, the AGV transport resource constraint, machine layout and job setup time have been integrated into the background of a flexible job shop.
Xinxin Zhou   +3 more
doaj   +1 more source

Research on Flexible Job Shop Scheduling Problem

open access: yesJournal of Physics: Conference Series, 2020
Abstract The adjustment time and processing time of the job on the machine are studied as an independent factor considering the influence of the adjustment time, such as installation and positioning, on the efficiency of production scheduling.
Xiangnan Li, Xu Liang
openaire   +1 more source

A FJSSP Method Based on Dynamic Multi-Objective Squirrel Search Algorithm

open access: yesInternational Journal of Antennas and Propagation, 2021
This paper comprehensively analyzes the characteristics of flexible job shop scheduling problem (FJSSP), takes the dynamic factors in the actual scheduling process such as the arrival and departure of jobs, the breakdown and recovery of machines into ...
Yanjiao Wang, Jieru Han
doaj   +1 more source

job shop scheduling problem:literature review

open access: yesTikrit Journal of Pure Science, 2020
As an extension of the Job Shop Scheduling (JSP), Flexible job-shop Scheduling Problem (FJSP), can be defined as one of the most significant problems in up-to-date manufacturing systems, recently a lot of studies have been conducted to address FJSP ...
Marrwa Abd-AlKareem Alabajee   +2 more
doaj   +1 more source

Home - About - Disclaimer - Privacy