Results 311 to 320 of about 3,948 (333)
Some of the next articles are maybe not open access.

A heuristic algorithm for the distributed and flexible job-shop scheduling problem

The Journal of Supercomputing, 2013
The distributed manufacturing takes place in a multi-factory environment including several factories, which may be geographically distributed in different locations, or in a multi-cell environment including several independent manufacturing cells located in the same plant. Each factory/cell is capable of manufacturing a variety of product types.
openaire   +1 more source

Survey of integrated flexible job shop scheduling problems

Computers & Industrial Engineering, 2022
Xixing Li   +8 more
openaire   +1 more source

An Estimation of Distribution Algorithm for the Flexible Job-Shop Scheduling Problem

2012
In this paper, an effective estimation of distribution algorithm (EDA) is proposed to solve the flexible job-shop scheduling problem with the criterion to minimize the maximum completion time (makespan). With the framework of the EDA, the probability model is built with the superior population and the new individuals are generated based on probability ...
Shengyao Wang   +3 more
openaire   +1 more source

Flexible job-shop scheduling problems with ‘AND’/‘OR’ precedence constraints

International Journal of Production Research, 2012
The purpose of this research is to solve flexible job-shop scheduling problems with ‘AND’/‘OR’ precedence constraints in the operations. We first formulate the problem as a Mixed-Integer Linear Program (MILP). The MILP can be used to compute optimal solutions for small-sized problems.
Sanghyup Lee   +3 more
openaire   +1 more source

Hierarchical Optimization for the Flexible Job Shop Scheduling Problem

IFAC Proceedings Volumes, 2004
Abstract In this paper we propose a new approach for the flexible job shop scheduling problem. This approach is based on the decomposition of the problem in an assignrnent problem and a sequencing probleln. The first part is ensured by an assignment technique based successively on a heuristic approach and a local search.
N. Zribi, I. Kacem, A. El Kamel
openaire   +1 more source

Scheduling Optimization of Flexible Job Shop Problem

2023 IEEE 7th Information Technology and Mechatronics Engineering Conference (ITOEC), 2023
Gu Chan, Zou Di
openaire   +1 more source

A Genetic Algorithm for the Flexible Job-Shop Scheduling Problem

2011
Scheduling for the flexible job-shop problem (FJSP) is very important. However, it is quite difficult to achieve an optimal solution to the FJSP with traditional optimization approaches. This paper examines the development and application of a genetic algorithm (GA) to the FJSP.
Jin Feng Wang, Bi Qiang Du, Hai Min Ding
openaire   +1 more source

A multistart biased random key genetic algorithm for the flexible job shop scheduling problem with transportation

International Transactions in Operational Research, 2023
Seyed Mahdi Homayouni   +2 more
exaly  

An efficient memetic algorithm for distributed flexible job shop scheduling problem with transfers

Expert Systems With Applications, 2020
Qiang Luo   +2 more
exaly  

Home - About - Disclaimer - Privacy