Results 71 to 80 of about 3,948 (333)

Setup‐Optimized Sequencing in Job Shops: Modeling Workstation Productivity and Lateness Behavior

open access: yesAdvanced Engineering Materials, EarlyView.
Setup‐optimized sequencing in job‐shop production creates a trade‐off between productivity improvement and schedule reliability. A WIP‐explicit modeling framework links sequencing‐induced productivity gains and lateness dispersion through the production operating curve.
Friederike Stefanowski   +2 more
wiley   +1 more source

A greedy heuristic approach for the project scheduling with labour allocation problem [PDF]

open access: yes, 2012
Responding to the growing need of generating a robust project scheduling, in this article we present a greedy algorithm to generate the project baseline schedule. The robustness achieved by integrating two dimensions of the human resources flexibilities.
Edi, Kouassi Hilaire   +2 more
core  

Field Report from Collaborative Research Center 1625: Heterogeneous Research Data Management Using Ontology Representations

open access: yesAdvanced Engineering Materials, EarlyView.
A unified research data management framework for heterogeneous materials data is presented. The system integrates multimodal datasets using ontologies and knowledge graphs, enabling interoperability and FAIR (findable, accessible, interoperable, reusable) data principles. By linking data across scales and workflows, it supports reproducible, Artifitial
Doaa Mohamed   +6 more
wiley   +1 more source

A Lightweight Procedural Layer for Hybrid Experimental–Computational Workflows in Materials Science

open access: yesAdvanced Engineering Materials, EarlyView.
We unveil a prototype hybrid‐workflow framework that fuses automatedcomputation with hands‐on experiments. Built atop pyiron, a lightweight, parameterized layer translates procedure descriptions into executable manual steps, syncing instrument settings, human interventions, and data capture in real‐time today.
Steffen Brinckmann   +8 more
wiley   +1 more source

Optimization of the Production of Rubber Compounds Using Mathematical Models

open access: yesAdvanced Engineering Materials, EarlyView.
Rubber compounds were mixed in a batch internal mixer, and symbolic regression was used to derive mathematical models linking recipe and process parameters to ram path, torque, and mixing quality (incorporation, dispersion, distribution). Subsequent optimization with evolutionary algorithms identified operating conditions that reduce specific energy ...
Anke Bardehle   +7 more
wiley   +1 more source

Flexible job shop scheduling using genetic algorithm and heuristic rules

open access: yesJournal of Advanced Mechanical Design, Systems, and Manufacturing, 2016
Job shop scheduling with the availability of more than one machine to perform an operation, also known as the flexible job shop scheduling problem, is computationally NP-hard.
Parinya KAWEEGITBUNDIT, Toru EGUCHI
doaj   +1 more source

Design Strategies and Emerging Applications of High‐Performance Flexible Piezoresistive Pressure Sensors

open access: yesAdvanced Functional Materials, EarlyView.
Flexible piezoresistive pressure sensors underpin wearable and soft electronics. This review links sensing physics, including contact resistance modulation, quantum tunneling and percolation, to unified materials/structure design. We highlight composite and graded architectures, interfacial/porous engineering, and microstructured 3D conductive networks
Feng Luo   +2 more
wiley   +1 more source

A Novel Hybrid Whale Optimization Algorithm for Flexible Job-Shop Scheduling Problem [PDF]

open access: gold, 2022
Wenqiang Yang   +4 more
openalex   +1 more source

Solution‐Processed Two‐Dimensional Indium Oxide on Sodium‐Embedded Alumina for Reconfigurable Optoelectronic Synaptic Transistors

open access: yesAdvanced Functional Materials, EarlyView.
Wafer‐scale two‐dimensioanl In2Se3 oxidized into InOx on sodium‐embedded beta‐alumina enables multifunctional reconfigurable electronics. Sodium ions accumulate within distinct spatial distribution under drain‐controlle and gate‐controlled operation. Drain‐control operation gives controllability of ultraviolet‐driven optoelectronic synaptic conductance
Jinhong Min   +13 more
wiley   +1 more source

Minimum-Energy Scheduling of Flexible Job-Shop Through Optimization and Comprehensive Heuristic

open access: yesAlgorithms
This study considers a flexible job-shop scheduling problem where energy cost savings are the primary objective and where the classical objective of the minimization of the make-span is replaced by the satisfaction of due times for each job.
Oludolapo Akanni Olanrewaju   +2 more
doaj   +1 more source

Home - About - Disclaimer - Privacy