Results 31 to 40 of about 3,286,488 (310)
Approximation results for flow shop scheduling problems with machine availability constraints [PDF]
This paper considers two-machine flow shop scheduling problems with machine availability constraints. When the processing of a job is interrupted by an unavailability period of a machine, we consider both the resumable scenario in which the processing ...
Strusevich, Vitaly A. +2 more
core +1 more source
A systematic literature review on energy-efficient hybrid flow shop scheduling
Scheduling problems should not only focus on minimizing completion time, but other performances, such as minimizing energy consumption, are urgent to investigate.
Dana Marsetiya Utama +4 more
doaj +1 more source
Scheduling practice and recent developments in flow shop and job shop scheduling
Each plant and/or service provider performs several tasks to satisfy customer demand. Every task consumes several resources in order to be completed. Scheduling deals with the allocation of limited resources to tasks over time. Because the resources used
Yenisey, Mehmet Mutlu
core +1 more source
The flow shop scheduling problem has been widely studied in recent years, but the research on multi-objective flow shop scheduling with green indicators is still relatively limited.
Wenbin Gu +3 more
doaj +1 more source
ABSTRACT Pediatric gastroenteropancreatic neuroendocrine neoplasms (GEP‐NENs) are extremely rare and clinically heterogeneous. Management has largely been extrapolated from adult practice. This European Standard Clinical Practice Guideline (ESCP), developed by the EXPeRT network in collaboration with adult NEN experts, provides (adult) evidence ...
Michaela Kuhlen +23 more
wiley +1 more source
Rockfill dams are among the most complex, significant, and costly infrastructure projects of great national importance. A key issue in their design is the construction stage and zone optimization.
Jun Zhang +4 more
doaj +1 more source
Solid Pseudopapillary Neoplasm of the Pancreas in Children and Adolescents: Expert Recommendations
ABSTRACT Solid pseudopapillary neoplasm of the pancreas (SPN) is a rare low‐grade malignant exocrine pancreatic tumor, mostly discovered during the second decade of life in females, with a very good prognosis, provided microscopically complete surgical excision is achieved.
Sabine Irtan +18 more
wiley +1 more source
Production processes in Cellular Manufacturing Systems (CMS) often involve groups of parts sharing the same technological requirements in terms of tooling and setup. The issue of scheduling such parts through a flow-shop production layout is known as the
Antonio Costa +2 more
doaj +1 more source
ABSTRACT As part of the European Cooperative Study Group for Paediatric Rare Tumours initiative, we developed standard clinical practice guidelines for ovarian sex cord stromal tumors, based on comprehensive national and international cohort analyses, literature review, and a final expert consensus conference.
Dominik T. Schneider +15 more
wiley +1 more source
Scheduling stochastic two-machine flow shop problems to minimize expected makespan [PDF]
During the past few years, despite tremendous contribution on deterministic flow shop problem, there are only limited number of works dedicated on stochastic cases.
Mehdi Heydari +2 more
doaj +1 more source