Results 221 to 230 of about 6,281 (245)
Some of the next articles are maybe not open access.

Optimization and Application of High Production and High Efficiency Mining Parameters of Fully Mechanized Caving Face

Advanced Materials Research, 2011
The size of the fully mechanized caving face is optimized by theoretical analysis and the dip length of the face is determined as 260m. With the method of numerical simulation, the reasonable cutting height of the face is determined as 3.5m and the caving method is determined as one round caving in order.
Zhong Ping Guo   +2 more
openaire   +1 more source

Design and Optimization of the Exhausting-Flowing Remover in Fully-Mechanized Top-Coal Caving Mining Face

Advanced Materials Research, 2011
Because of its high output,much more dust is produced in fully-mechanized Longwall mining with top-coal caving (LMTC) mining faces than in conventional mechanized mining faces without top-coal caving. Now dust control in fully-mechanized LMTC mining faces has become a key technological problem needed to be solved.
Guo Dong Zhai   +2 more
openaire   +1 more source

Effect of floor failure in fully mechanized caving of extra-thick coal seam in Datong Mining Area

Arabian Journal of Geosciences, 2021
Hongfei Duan, Lijuan Zhao, Yang Chen
semanticscholar   +1 more source

Home - About - Disclaimer - Privacy