Results 41 to 50 of about 1,103 (146)

Projektové řízení přípravy kontingentu mládežnické organizace na zahraniční akci

open access: yes, 2021
This bachelor thesis deals with the organization of the preparations of the Junak – Czech Scouting to a foreign event organized by another scout organization. Specifically, it will be the Central European Jamboree.
Urbanová, Vendula
core  

Short‐Term Scheduling Optimization of a Single‐Pipeline Refining System With High Melting Point Crude Oil

open access: yesAsia-Pacific Journal of Chemical Engineering, Volume 21, Issue 3, May/June 2026.
ABSTRACT In order to reflect the actual production situation more comprehensively and optimize the production cost, this paper solves the short‐term scheduling optimization problem for a single pipeline containing high melting point crude oil. Based on the refining plan given by the upper layer, a multi‐objective optimization model with high melting ...
Jing Yao   +5 more
wiley   +1 more source

A Concept of a Digital and Traceable Manufacturing Documentation Based on Formalized Process Description Applied on Composite Aircraft Moveable

open access: yesAdvanced Engineering Materials, Volume 28, Issue 7, 8 April 2026.
The documentation of component manufacture has become an essential part of today's production processes, especially for the analysis and optimization of production or component design with regard to structural performance, economic efficiency, and sustainability.
Björn Denker   +4 more
wiley   +1 more source

BIM and AI Integration for Dynamic Schedule Management: A Practical Framework and Case Study

open access: yesBuildings
Traditional project scheduling tools like Gantt charts struggle with dynamic adjustments and real-time optimization in complex construction projects, leading to inefficiencies and delays.
Heap-Yih Chong   +3 more
doaj   +1 more source

A Novel Hybrid Recruit Simulated Annealing and Rat Swarm Optimization Algorithm for Permutation Flow Shop Scheduling

open access: yesEngineering Reports, Volume 8, Issue 4, April 2026.
Rat swarm position update mechanism in HRSA‐RSO, illustrating the collective exploration behavior around the prey target (A*, B*). ABSTRACT The permutation flow shop scheduling problem (PFSSP) is a classical NP‐hard problem that aims to determine an optimal job sequence across machines to minimize makespan.
Mourad Mzili   +5 more
wiley   +1 more source

The Relationship Between School Counselor Self‐Efficacy, Empowerment, Critical Consciousness, and Social Determinants of Health Competency: An Initial Investigation

open access: yesJournal of Counseling &Development, Volume 104, Issue 2, Page 180-197, April 2026.
ABSTRACT This study employed an ecological perspective to examine the relationship between school counselors’ perceived social determinants of health (SDoH) competency and demographic, psychosocial, and contextual factors, including professional self‐efficacy, psychological empowerment, critical consciousness, and structural empowerment (SE).
Tevin Middleton   +2 more
wiley   +1 more source

ProteinMCP: An agentic AI framework for autonomous protein engineering

open access: yesProtein Science, Volume 35, Issue 4, April 2026.
Abstract Computational protein design is often constrained by slow, complex, inaccessible, and highly sophisticated and expert‐dependent workflows that hinder its transferrability and generalization power for broader applications. We present ProteinMCP, an agentic AI framework designed to accelerate and democratize protein engineering.
Xiaopeng Xu   +6 more
wiley   +1 more source

A Quality Improvement Initiative to Standardize Pneumocystis jirovecii Pneumonia Prophylaxis in Pediatric Patients With Solid Tumors

open access: yesPediatric Blood &Cancer, Volume 73, Issue 3, March 2026.
ABSTRACT Background Pediatric patients with extracranial solid tumors (ST) receiving chemotherapy are at an increased risk for Pneumocystis jirovecii pneumonia (PJP). However, evidence guiding prophylaxis practices in this population is limited. A PJP‐related fatality at our institution highlighted inconsistent prescribing approaches and concerns about
Kriti Kumar   +8 more
wiley   +1 more source

PENJADWALAN PROYEK PEMBANGUNAN GEDUNG AKUNTANSI FAKULTAS EKONOMI UNIVERSITAS JEMBER MENGGUNAKAN METODE GANTT CHART

open access: yes, 2018
Tingkat pertumbuhan infrastruktur di daerah Jember dari sampai dengan tahun 2017 mengalami peningkatan, terbukti dengan banyaknya pengembangpengembang baru yang di wilayah Jember, salah satunya adalah Proyek Pembangunan Gedung Akutansi Fakultas ...
YOWIANTORO, FERRY
core  

Penjadwalan Proyek Pembangunan Gedung Fakultas Keguruan dan Ilmu Pendidikan Universitas Jember Menggunakan Metode Gantt Chart

open access: yes, 2018
Tingkat pertumbuhan infrastruktur di daerah jember dari sampai dengan tahun 2017 mengalami peningkatan, terbukti dengan banyaknya pengembang- pengembang baru yang di wilayah jember, salah satunya adalah Proyek Pembangunan ruang kelas Gedung Fakultas
SHOFYAN, SHOFAN
core  

Home - About - Disclaimer - Privacy