Results 161 to 170 of about 157,408 (308)

General consortium meetings and key governance meetings scheduled (M10)

open access: yes
Deliverable due date: M2, M10Task 3.2 Organize project meetings (M1-M24) (UMCU, GSK)WP3 will schedule, prepare (draft agendas, arrange logistical details), execute and report (minutes/action lists) general consortium meetings (kick-off/annual meeting) and key governance meetings (D3.5/D3.6).
openaire   +1 more source

Microstructured Electrode‐Piezopolymer Interface for Ultrasound Transducers With Enhanced Flexibility and Acoustic Performance

open access: yesAdvanced Materials Technologies, EarlyView.
Flexible piezopolymer ultrasound transducers are engineered by tailoring the electrode–piezopolymer interface using metallic, flake‐based, and porous graphene electrodes. Laser‐induced graphene's porous structure enables polymer infiltration, strengthening interfacial coupling and enhancing piezoelectric response and acoustic output.
Spencer Hagen   +3 more
wiley   +1 more source

Correction: Young people's data governance preferences for their mental health data: MindKind Study findings from India, South Africa, and the United Kingdom. [PDF]

open access: yesPLoS One
Sieberts SK   +30 more
europepmc   +1 more source

Multiobjective Codesign Optimization of a Planar Pneumatic Artificial Muscle‐Based Snake‐Like Robot for Enhanced Agility and Energy Efficiency

open access: yesAdvanced Robotics Research, EarlyView.
A codesign multiobjective optimization framework was developed to enhance the morphology and controller of a snake‐like robot driven by artificial muscles. It improved planar locomotion, agility, and power efficiency. The approach optimized link geometry and controller gains, revealing that shorter muscles near joints and longer linkages maximize ...
Ayla Valles, Mahdi Haghshenas‐Jaryani
wiley   +1 more source

General consortium meetings and key governance meetings scheduled (M2)

open access: yes
Deliverable due date: M2, M10Task 3.2 Organize project meetings (M1-M24) (UMCU, GSK)WP3 will schedule, prepare (draft agendas, arrange logistical details), execute and report (minutes/action lists) general consortium meetings (kick-off/annual meeting) and key governance meetings (D3.5/D3.6).
openaire   +1 more source

TreeSpider: In‐Canopy Exploration With Tether‐Based Aerial Modular Arms

open access: yesAdvanced Robotics Research, EarlyView.
A tethered drone with perching arms and a 360° ring enables unprecedented maneuverability within dense forest canopies. By dynamically adjusting tether length and decoupling pitch from the frame, it navigates between branches, senses multiple trees, and interacts physically with foliage.
Luca Romanello   +7 more
wiley   +1 more source

Understanding digital health literacy as a structural determinant of health and public health capability. [PDF]

open access: yesBMC Glob Public Health
Wamala-Andersson S   +6 more
europepmc   +1 more source

COLLECTIVE ACTION OF LOCAL CONSORTIUM FOR ENVIRONMENTAL GOVERNANCE: AN ANALYSIS FROM THE CAPITALS OF THE COMMUNITY

open access: yes, 2013
Los consorcios locales en zonas transfronterizas son una experiencia novedosa de gobernanza ambiental en Centroamérica. Estas iniciativas han promovido acciones concretas de carácter político, económico y social que buscan mejorar los medios de vida de la gente y el mejor uso de los recursos naturales.
Siles-Calvo, Jackelline   +2 more
openaire   +1 more source

A Soft Robotic Fish With a Dielectric Elastomer Actuator Body and Negative Stiffness Spine

open access: yesAdvanced Robotics Research, EarlyView.
This work introduces a bio‐mimetic soft robotic fish driven by fiber‐reinforced dielectric elastomer actuators integrated as its body. By prestretching this active skin against a flexible spine, a negative stiffness system is created, enabling large‐amplitude bending.
Markus Koenigsdorff   +4 more
wiley   +1 more source

Home - About - Disclaimer - Privacy