Evaluation of semi-distributed hydrological models performance in borkena watershed; upper awash basin, Ethiopia [PDF]
Flood is one of the most significant disasters in human life and economic destruction. To challenge this disaster, the use of models is very important to predict the magnitude and impact of river flow and to find a solution of the problems. This research
Geteneh Teklie Alemu +4 more
doaj +2 more sources
Application of Synthetic Unit Hydrograph on HEC-HMS Model for Flood Forecasting [PDF]
The surface runoff model of the HEC-HMS hydrological modeling system is mainly simulated through the unit line method. The simulated results usually had big errors because of the flood with different net rainfall magnitude using the same set of unit ...
Haibo Ma, Xin Dong, Wenjuan Chang
doaj +2 more sources
In the present study, the streamflow simulation capacities between the Soil and Water Assessment Tool (SWAT) and the Hydrologic Engineering Centre-Hydrologic Modelling System (HEC-HMS) were compared for the Huai Bang Sai (HBS) watershed in northeastern ...
, Miyuru B Gunathilake
exaly +3 more sources
Performance of long-term continuous hydrological models in fluvial flow simulation in a large-scale river basin [PDF]
Hydrological models are an effective tool for the estimation of peak floods and runoff in planning water development and flood mitigation/adaptation.
Zhuo Zhang
doaj +2 more sources
PEMODELAN HIDROLOGI DENGAN HEC-HMS DI SUB-DAS KARANGMUMUS SAMARINDA
Hydrological Modeling with HEC-HMS in the Karangmumus Sub-watershed Samarinda. The HEC-HMS is used to develop a model of water flow in the Karangmumus which can be used as an alternative for flooding problem. The purpose of this study is to determine the
Rachmad Mulyadi +2 more
doaj +3 more sources
Study of rainfall-runoff relationship using hydrological modelling system (HEC-HMS) for Kurau river Basin, Perak [PDF]
Landuse changes and urbanisation has always been blamed as among the major causes of the increase in the magnitude and frequency flooding. Flash flood had occured in Kurau River due to low lying of the draining area which the drainage capacity cannot ...
Amanina, Nasruddin
core +1 more source
Analisis Debit Rencana Tukad Unda Bagian Hilir Menggunakan HEC-HMS
Pembangunan waduk muara yang berlokasi di Tukad Unda merupakan pembangunan dalam tahap perencananaan. Waduk muara dibangun sebagai infrastruktur mitigasi bencana prasarana pengendali banjir. Perkiraan pembangunan waduk muara dari tahun 2020 sampai dengan
I Putu Gustave Suryantara Pariartha +2 more
doaj +2 more sources
ANALISIS KALIBRASI MODEL HSS CLARK DENGAN MENGGUNAKAN PROGRAM HEC-HMS
Penerapan Hidrograf Satuan Sintetik (HSS) Clark pada DAS Lubuk Bendahara membutuhkan analisis yanglebih detail. Data curah hujan dan pencatatan muka air otomatis (AWLR) lapangan diperlukan sebagai bahankalibrasi. Parameter kehilangan air (loss model), aliran dasar (baseflow) dan transformasi aliran (transformmethod) dalam hidrograf satuan sintetik ...
null Syahrul Ramadhani +2 more
openaire +3 more sources
Daily Runoff Prediction in Maroun Basin Using HEC-HMS Model [PDF]
The prediction of stream-flow have incessantly attracted water engineer studies with due regard to its importance in the design of water structures, water intake from the rivers, planning and operation of reservoirs of dams, and erosion and sedimentation
Abbas Ahmadpor +2 more
doaj +2 more sources
Application of HEC-HMS Model for Flow Simulation in the Lake Tana Basin: The Case of Gilgel Abay Catchment, Upper Blue Nile Basin, Ethiopia [PDF]
Bitew G. Tassew +2 more
exaly +2 more sources

